An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FROM BORE PROTECTION TO GROUNDWATER EXTRACTION, IT’S INDIA’STRU-CHOICE. Time-tested Borewell PipingSystems. Pipes asper IS:12818 PRODUCTRANGE Screen & Casing Pipes : 11/2” - 16” Cdumn Pipes : 1” -4” QUALITYTEST EXTENSIVELY USEDIN • Tensiletest • Impacttest • Vicat softening temperaturetest • Effect on watertest • Hydraulic pressuretest AGRICULTURE 26

  2. APPLICATIONS • Toextractgroundwaterforfarmsandfields. • For connections to residential & commercial buildings, public places etc. MAJORADVANTAGES • Borediameterremainsconstant,ensuringconstant flow overlifetime. • Superior resistance to most of the chemicals, noscaling, makes the system almost maintenancefree. • Longlife. • Easytotransport,store,handleandinstall. • Saves labour & installationcost. • SmoothboreensureshigherflowcomparedtoG.I.pipeline of the same size. Noclogging. JOINTINGMETHOD ThreadedJoint. FOR BOREWELL & TUBE WELLAPPLICATIONS For borewell& tube wellapplications BEND C-CLAMP C. I. ADAPTOR(MALE) COVER GROUNDLEVEL CASINGPIPES SUBMERSIBLE DELIVERYPIPES SEALINGELEMENT SCREENPIPES CENTERINGGUIDE CLAY C. I.ADAPTOR (FEMALE) SUBMERSIBLEPUMP CASINGPIPES PLUG SPECIFICATIONS Standards IS - 12818-2010 / Marked items will bear ISImarks 11 TPI V threads upto 80mm, 100mm (CS) Casing pipes as per IS-554-1999 & Trapezoidal threads form 100mm as per IS-12818-2010 with rubber sealingrings. Type ofThreads Square Notes: Above 80m 262ft. upto 250m820ft. Above 250m 820ft. upto 450m1476ft. A)Suitability: Forwells upto 80m262ft. B)Threads Pipes will have internal threads at one end external threads at other end with thread protectioncover. TRUBORE BOREWELL PIPINGSYSTEMS 29

  3. C) Specificationrequired Slot width 0.75, 1.00, 1.50, 2.00 & 3.00mm 26

  4. DIMENSIONS MEDIUM WELL SCREEN (RMS) & DEEP WELL SCREEN (RDS) PIPES WITH RIBS/RIBBED SCREENPIPES PLAIN MEDIUM WELL SCREEN (PMS) & PLAIN DEEP WELL SCREEN (PDS) PIPES MEDIUM WELL CASING (CM) & SHALLOW WELL CASING (CS)PIPES 29

  5. DEEP WELL CASING (CD)PIPES SUBMERSIBLE DELIVERY PIPES/RISING MAINPIPES 28

  6. DO’S DON’TS JOINTING & INSTALLATION Ensurethatpipethreadsareproperand clean it with normal water to avoid forcefuljointing. Don’t use any chemical for cleaningthe pipethread. Ensure that rubber seal is properly placed in its position, without any twist/cut,whiletighteningthethreads to avoidleakages. Don’t apply any lubricant on pipe thread. Before joining the pipe with pump, itis recommended to provide pumpguard between pipe coupler & pump metal adaptor. Don’tover-tightenthejointstoavoid breakages. Assemble the Trubore G I metaladaptor withpump. Don’t use pipe/chain wrench to tighten thejoints. Duringassemblyofthepipe,initially hold the pipe/coupler with hands & tighten it, for final jerk, always use rope/strapwrenchtotightenthepipe properly. Don’t dump gravel at a very high rate to avoid excessabrasion. Fixanylonropetocastironadaptoras a safety measure against falling of submersible pump duetomishap. Don’t use agri-pipes (with solvent cement joint) for borewells as their mechanical strength is not designedfor this application. Clamp the pipe below coupler (at defined location on pipe) at the timeof lowering Trubore rising main pipe into theborewell. Don’t hammer the pipes during assembly. Always use chain pulley forlowering Trubore rising mainpipe. TRUBORE BOREWELL PIPINGSYSTEMS 29

  7. Illustrations used are only for reference, the colour of pipe & fittings will change as per theproduct. 30

  8. GUIDELINES FOR INSTALLATION OF SCREEN& CASINGPIPE: • Drilltheboreoftherequiredsize&depthinthegroundusing themethodofaugerdrilling/waterjetboring/hydraulicrotary drilling/coredrilling.Duringdrilling,careshouldbetakenthat itisverticallystraightdownwithoutanybends.Saveslabour& installationcost. • Fit “C” clamp below the bell end on the pipe and lower the assemblydonewithhelpofchainpulleyblock(Providesand trap with end plug asnecessary). • Afterloweringthepipeuptotheclamplevel,fixtherubber gasket on another pipe & tighten it gently with thelowered • pipe. After tightening, use pipe/chain wrench for proper jointing, but do not overtighten. • Fixthenextclampwiththepipeaboveandbellendbelow and connect the chain pulley withclamp. • Removetheclampofloweredpipe&startloweringfurther. • Repeat the jointing method till the required depth ofborewell. • Centeringguidetobefittedwherevernecessary. • Fillthe gravelbetweenpipe&borehole. Note: Toconstructthebore/tubewellCASING/SCREENING& RISING MAIN pipes arerequired. CASING pipes are highly recommended in the area where loosesoil&silt/looseboulders&loosestonesareprevalent). • Fittherubbergasketproperlyonthespaceprovidedonthe ribbed screen/casingpipes. GUIDELINES FOR INSTALLATIONOF RISING MAINPIPE: • AssembleSUBMERSIBLEDELIVERYPIPEwithpump,always use strap wrench/rope for lastjerk. • Fixanylonropetothecastironadaptorasasafetymeasure against falling of submersible pump due to mishap (run the nylon rope throughout the borewell length & tie it with top clamp). • Fit the “C” clamp below coupler (at defined location on pipe) & lower the assembly inside the CASING pipe carefullywith the help of a chainpulley. • Oncepipewillbeloweredintheborewelluptotheclamp level,fixtherubberringonotherpipe&tightenitgentlywith thehelpofrope/strapwrench,tillhalfoftheringgetsinside thecoupler. • Once screen & casing pipes are installed properly, followthe below guidelines for installation of PUMP & SUBMERSIBLE DELIVERYPIPE. • Beforestartinginstallation,pre-checkifsubmersiblepumpis in good workingcondition. • JointheTruboremetaladaptorwiththesubmersiblepump with the help of chainwrench. • Beforestartingthepipeassembly,cleanthepipethreadswith normal water to avoid forcefuljointing. • Before joining the pipe with pump; ensure pump guard isinstalledproperlybetweenpipecoupler&pumpmetal adaptor. IMPORTANTSTEPS TRUBORE BOREWELL PIPINGSYSTEMS 31