An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Failure Mode and Effects Analysis System FMEA Design FMEA Process FMEA

  2. Purpose • FMEA is a process designed to identify potential identify failure modes and to rate the severity of their effects.

  3. Problem Solving Process • Requires problem identification before we proceed to a possible solution • We need to prioritize the problems so our energy is directed • We want to attack the problem upstream--root cause • Our countermeasure and action plans must be implemented

  4. Recall: Quality Function Deployment • We begin at the end with a statement of needs and wants (standards etc.) • We ask what do we do to achieve these outcomes. • We then continue to ask about the elements of each sub-function we design • We then ask about the process of manufacture.

  5. The Quality Matrix

  6. Begin with the ultimate customer • Identify how the thing you deliver will be used. • Ask the client about the use so as to help identify needs and wants. • What are the subsystems we would put in place to meet these needs/wants?

  7. Move backwards from the ultimate customer • Ask what process is required to reach the customer. • This process step is served by another supplier • Continue backwards--each in-process customer has an in-process supplier.

  8. The Problems are Too Great and the Day is Short • We need to work on what we can put our hands around --not everything • The idea is to use a mechanism to prioritize the work.

  9. Pareto Principle • An essential element of this process involves the Pareto Principle • 80% of the occurrences of ill effects can be attributable to 20% of the causes • So, if we attack a few of the causes we can reduce the frequency of the problems in a substantial way.

  10. Example • In the health care industry, over 80% ---I’m told 88%---of the charges come from under 20% of the carriers of insurance. • New advances in health care will likely use formats other than HMOs.

  11. Pareto Chart Y-Axis • The y-axis will be one of three quantities • Severity: S (of the effect) • Severity times Occurrence: S*O • RPN: Severity*Occurrence*Detection (Risk Priority Number)

  12. Pareto Chart X Axis • Failure Modes • Obtained by brainstorm and or data

  13. System FMEA • Before we design the products, we want to analyze the failure modes that can occur between subsystems and processes that are needed.

  14. System Functions • What are the building blocks for the proposed operation? • How do these blocks--processes and subsystems--relate to each other? • Example: To generate light in a car we need a variety of subsystems to work.

  15. Output of System FMEA • The system failure mode prioritized by numbers • The specific functions that we need to monitor are identified. • A set of design actions to reduce the incidence of failures are put in place

  16. What are the system functions here? • The battery operates the objects they are designed to power. • What do we need to do to make this happen? (specifically, we want to know the sub-systems needed to reach this point.):

  17. Design FMEA • Before a product is released to manufacturing we need to analyze the potential failure modes in the product due to design deficiency • What functions/products do we need? Will the design work? Is it verified? • Actions: Revise specifications, change design simulation

  18. Output of Design FMEA • Product failure modes and numbers that reflect their rank order • Critical characteristics that we want to study • Product design actions to reduce the frequency of failures and or Robust Design to reduce the effect of causes of failures

  19. Process FMEA • The failure modes in production and the administrative processes that can be caused by process deficiencies • Our goal here is to connect the process with the outcomes and work in an EFFECTIVE way to reduce the failures.

  20. FMEA Roadmap • Potential failure mode -> • Effect (Determine Severity)-> • Cause (determine Occurrence)-> • Current Controls (Determine Detectability) • Determine Risk Numbers (S, O, RPN) • Actions Leading to Improvement

  21. Roadmap

  22. FMEA Development process

  23. Process FMEA Template

  24. What it looks like

  25. An effect of a failure is the consequence(s) of a failure mode that would be noticed or experienced at the next operation, at a subsequent operation, by a downstream user, or by the ultimate customer. Consider Next user Downstream users Product operation Safety Government regulation Effects

  26. Severity is a rating corresponding to the seriousness of an effect of a potential failure mode. No effect 1 No effect on system or output performance or on subsequent processes Very Slight Effect 2 Customer probably will not notice the failure. Nuisance fault noticed Slight Effect 3 Slight effect on output performance. Customer slightly annoyed. Nuisance fault obvious. Minor Effect 4 Minor effect on output or process performance. Slight deterioration. Chronic nuisance fault. Moderate Effect 5 Moderate effect on performance. Customer dissatisfied. Nuisance repair required. Non-vital part non functional. Significant Effect 6 Performance degraded but safe. Discomfort. Repair required. Non-vital part nonfunctional. Major Effect 7 Rework/repairs necessary. Performance severely affected but safe. Dissatisfied customer. Subsystem inoperable. Serious Effect 8 Equipment damaged. System inoperable but safe. Very dissatisfied customer. Very Serious Effect 9 Potentially hazardous failure. Safety related but gradual failure. Subsequent process distruption Hazardous Effect 10 Hazardous failure. Safety related – sudden failure. Government regulation non-compliance.

  27. Generic: Cause of Failure • Method • Equipment • Materials • People • Environment

  28. Examples • Failure Mode: Deposition too thick • Potential Cause: Air pressure peak too high

  29. Process FMEA Design FMEA Process function & # Product function Failure mode Severity Occurrence Failure mode Severity Occurrence Current Controls (SPC) Design Verification Actions: Design of Experiments Revise Standard Operating Procedures Material Evaluation Actions: Revise Specifications Change Design Simulation Verification: Promotion Nonconforming or Variation Reduces Fewer Returned Sales Verification: Risk Numbers Reduce Additional Simulation Additional D.V. “Builds” Failure Mode and Effect Analysis

  30. Control Plans: Idea • The plan is a record of how you intend to control the process. • It changes as we learn: called a living document • It should eliminate processes that were not effective and introduce process steps that are effective • It is essential that broad (cross-functional) input be used to create the plan

  31. Team • Include all major process leaders-cross-functional • Bring people from all levels • Make sure everyone is empowered

  32. System Thinking Issues • Eliminate barriers between units, people and or departments-between design and manufacture, between purchasing and users etc. • Eliminate numerical goals, M.B.O., etc that cause people to tamper or use methods that take us away from our purpose • Institute a leadership that has us focused on the goal.

  33. And also…. • Drive out fear • Engage people in learning how to improve the system • and act on ideas...

  34. Control Plan Includes: • A plan to control each process step: Connect to the flow chart • We only want to control “important” failure modes • The control plan should identify actions • We want actions for only the vital few failure modes

  35. Categories of Measurements • Significant characteristics-dimensions of final product etc. • Critical Characteristics-features of the process that affect the SC values • The critical characteristics should be predictors of the significant characteristics

  36. Key Measurement Features in Control Plan • For each step of the process we have the Significant Characteristics (SC) • Determined by the next in process customer • We have the Critical Characteristics (CC) • Determined by the process that gives rise to the SC

  37. How are the SC and CC related? • Design of experiments is the tool we use to help us identify the connections between process parameters and significant characteristics • It is essential that we NOT look at features one-at-a-time with all else held constant. • Without a several factor study we can’t learn about interactions

  38. First Step: Stability • Unless the characteristics we want to control exhibit stability, it is difficult to make improvement. • Operational definitions of stability should be described in the control plan. • The implementation of these rules with respect to the key features are described in the control plan too.

  39. Connections • The Control Plan identifies failure modes with product characteristics (SC) • The Control Plan identifies causes with process parameters (CC) • The strength of the relationship is estimated by the team and portrayed in an input-output matrix

  40. Input <-> Output Matrix • List the causes--particular process parameters CC-- as rows of the table • List the the failure modes as SC--significant characteristics as columns of the matrix. • Have the team identify the strength of the relationship as the matrix entry

  41. One way to identify the few CC or SC for focus • For each SC we can determine the strength of the relationship with each CC (a 5 or ten point scale say.) Team creates a number. • We would add the strength measures for each CC across all SC to establish a priority rating for the Critical Characteristics. • We can do the same in the other direction to help focus on a few SC

  42. Data Validation • The relationship between particular SC and CC --process parameters--must be validated. • The strength of the relationship and potentially complicated interactions needs to be studied. • Scatter diagrams are always preferred to correlation measures

  43. Summary • For each process step identify the key SC and CC. • Record results in the Control Plan • Obtain customer approval • Always look upstream for more effective control

  44. Control Plan Categories • Pre launch • Process capability study • Prototype Control plan • Machine control plan • Ongoing • A living document to capture the current state of the plan--and history

  45. Proactive Ideas • Change design for elimination of the failure mode • Create a robust design so as to eliminate effect • The new design would be directed at the high severity and occurrence items in our Pareto Analysis

  46. Reactive Plan • Add controls and inspection to improve our ability to detect the failure mode

  47. General Strategy • Change design and or the process to prevent or reduce the frequency of occurrence of a few causes • Start with a reactive plan and continue the process of improvement by moving upstream in the process. Find process parameters that are excellent predictors of final significant characteristics--and control these.