html5-img
1 / 4

Outcome week 40 - BCTs

Outcome week 40 - BCTs. Beam dump fixed display. LHC BCTs: Big improvement. Proxy does not seem to be issue anymore. – We also have all 4 dump line BCTs now. Logging and some ergonomics of applications and fixed displays to be sorted out.

abrial
Télécharger la présentation

Outcome week 40 - BCTs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Outcome week 40 - BCTs Beam dump fixed display • LHC BCTs: • Big improvement. Proxy does not seem to be issue anymore. – We also have all 4 dump line BCTs now. • Logging and some ergonomics of applications and fixed displays to be sorted out. • Capture and beam dumped events always cause both ring beam systems to publish. • For XPOC: BCTs acquire fine...the timestamping needs to be sorted out. • SMP has not been tested yet.

  2. Outcome week 40 – AC Dipole B1: Horizontal/vertical waveform MKQA/ACDipole control • AC Dipole: • Essentially operational. (Power testing on system beam 2 still ongoing) • Required waveform acquisition types (envelope, the whole waveform) all possible with OASIS. • Little issue: hole in waveform????

  3. Outcome 41 – Misc. • Abort gap monitor application: • Trim for critical settings: MCS functionality fully verified. • Still strange behaviour of application when trimming graphically. Will test again. • IQC connected to SIS and injection sequencer: • Testing requires LHC cycle in SPS • VIRTUAL CRITICAL SETTINGS: • Fully available now. The whole chain has been tested and verified. • We need to define them for XPOC, SIS, IQC.

  4. This week Concentrator stress test – ongoing right now Feedbacks Totem controls test Tune, headtail monitor Preparation for PGCs If possible: test of IQC connected to SIS and Injection sequencer ALICE spectrometer + compensators ramp test + SIS + interlocking check First vacuum tests BTV interlock tests

More Related