Community Practice

Community Practice. Asset Management. Dawson City Hall / Fire Hall.

acalkins
Télécharger la présentation

Community Practice

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Community Practice Asset Management

  2. Dawson City Hall / Fire Hall • The City Hall / Fire Hall building is a two-story building constructed in 1988 and relocated to its current location in 2000. The relocation included a new concrete slab foundation, new superstructure framing, and other structural retrofits. The building mechanical systems were also updated in 2000 as part of the building retrofit.

  3. Current Replacement Value

  4. Asset Condition Assessment • Conducted by a third party consultant • Looks at all facility systems: • Siteworks • Exterior • Interior • Services (lighting/plumbing/mechanical) • Structure • Condition of each system is ranked 1-5 (very good to very poor) • Overall condition rating can be used to establish maintenance and replacement priority

  5. Why? • Include condition related improvements in financial planning • Identify short term maintenance goals and long-term replacement or improvement needs • Inform future funding applications or requests (ie. LED lighting) • Amortize large costs over time, and be prepared • Avoid increasing maintenance costs due to neglect