An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 1 Barrage en enrochements Noyau en bton bitumineux Programme damnagement de la Haute-Morge : Ralisation dun site de stockage sur le Sep

    2. 2 Contexte Saint-Hilaire-la-Croix, Puy-de-Dme, Auvergne Objectif : Irriguer lagriculture Bassin versant de 27 km, retenue de 4,7 millions de m3

    3. 3 Gomtrie gnrale

    4. 4 Implantation

    5. 5 Etanchit Voile dinjection Voile trilinaire ralis en descendant : effet encagement Type de coulis : eau-ciment-bentonite C/E 1.5 Maillage en carr volutif: 1.5 m pour 3 m

    6. 6

    7. 7 Etanchit Noyau bitumineux Composition : bitume 6 %, sable 32% , granulats (2 16 mm) 55 % et fines 13 % Noyau vertical : conomie de matriau et facilit de mise en oeuvre Epaisseur 80 cm Volume 2 700 m3 Permabilit k = 5.10-9 m/s

    8. 8 Etanchit Noyau bitumineux Loi de Darcy : permabilit k = 5.10-9 m/s Dbit de fuite : deux verres deau / seconde

    9. 9 Interface noyau/galerie

    10. 10 Interface noyau/crte Calcul de la revanche : 2 m ? crte 503,5 NGF Protection anti-vagues en rip-rap

    11. 11 Zones de transition Trois critres (Terzaghi-Sherard) : Rtention D15/d85 < 4 Permabilit D15/d15 > 5 Uniformit Cu = D60/D10 < 6 Filtre 1 : Dmax = 2 cm Filtre 2 : Dmax = 4 cm Enrochements : Dmax = 70 cm Volume des filtres : 17 000 m3

    12. 12 Contrle du dbit de fuite : dbitmtres

    13. 13 Stabilit du barrage amont

    14. 14 Contrle des tassements (Relevs topographiques)

    15. 15 Evacuation des crues

    16. 16 Vidange de fond et DP

    17. 17 Restitution

    18. 18 Construction de la galerie hydraulique

    19. 19

    20. 20 Approvisionnement matriaux

    21. 21 Carrire

    22. 22 Mise en place noyau bitumineux et filtres

    23. 23 Leve dune couche Moyens utiliss

    24. 24

    25. 25

    26. 26

    27. 27

    28. 28 Budget prvisionnel Cot total : 10 000 000 Prix actualis 1993 : 46 000 000 FF