1 / 23

IEEE 802.15 Working Group for Wireless Personal Area Networks ™

IEEE 802.15 Working Group for Wireless Personal Area Networks ™. TG1 Opening Report November 2001 Austin, TX USA. Contents. Summary Motion Planning Overview of Session #15/Austin Objectives Submissions Session Graphic RevCom Submission

adamdaniel
Télécharger la présentation

IEEE 802.15 Working Group for Wireless Personal Area Networks ™

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.15 Working Group for Wireless Personal Area Networks™ TG1 Opening Report November 2001 Austin, TX USA Ian Gifford, Consultant

  2. Contents • Summary • Motion Planning • Overview of Session #15/Austin • Objectives • Submissions • Session Graphic • RevCom Submission • [01462r1aP802-15_WG-P802.15.1-RevCom-Submission.pdf] • Project Planning Status • Next Meeting • Tentative Needs for Dallas • Objectives for Dallas • Drafting History Ian Gifford, Consultant

  3. Summary • Task Group 1 (TG1) is deriving a draft standard from the Bluetooth™ specification under IEEE PAR 802.15.1 At Session #15, motion SEC, address WG & SEC comments, IF ANY, achieve majority approval from the WG & SEC motions and enter RevCom phase. Pre submitted 26Oct01. • During the Jul01/Nov01 between-session-period – busy • SB1 ballot & resolution • SB2 ballot & RevCom Application for approval of P802.15.1 • IEEE-SA, PatCom, RevCom, and BSIG • SB2 has 2 Disapproving Voters and 19 unresolved comments (comment #7 is resolved as the 3rd DISAPPROVING Voter changed to a YES w/ comments. • The TG1 will update their Project Plan –00/375r3 [00375r3P802-15_TG1-Project-Planning.pdf]; once SEC approval is achieved. ETA 17Nov01. • The 802.15.1 submittal will be reviewed by RevCom. Preliminary comments will be sent to Project 802.15.1 by the middle of November. • Scheduled StB Committee Meetings 4-6Dec01: • http://standards.ieee.org/board/stdsbd/meeting-notice.html • 4Dec01 PatCom - 6.2 Letter of Assurance from Bluetooth SIG, Inc. for P802.15.1 • 5Dec01 RevCom - P802.15.1/D1.0.1 New: "Standard for Information Technology… Ian Gifford, Consultant

  4. Planned Motions • Motions • #1 Wed, 14Nov01 to Full WG • #2 Fri, 16Nov01 to SEC Ian Gifford, Consultant

  5. Session #15/Austin – Motion #1 to the Full WG • Move to submit P802.15.1/D1.0.1-2001 to 802 SEC for approval of submission to RevCom. Non Technical 50% (Procedural) Moved: ? Second: ? Y/N/A: // Note: TG1 pre-submitted D1.0.1 to RevCom on 26Oct01. Ian Gifford, Consultant

  6. Session #15/Austin – Motion #2 to the 802 SEC • Move that the ExCom forward IEEE Draft 802.15.1/D1.0.1 to RevCom. Non Technical 50% (Procedural) Moved: ? Second: ? Y/N/A: // Note: TG1 pre-submitted D1.0.1 to RevCom on 26Oct01. Ian Gifford, Consultant

  7. Session #15/Austin – Objectives • Post Session #14/<Bellevue>17-21Sep01 • 1. FINALIZE RESOLUTION OF 1ST (SB2) IEEE SPONSOR RECIRCULATION BALLOT • 2. IF IT PASSES, FINALIZE DRAFT 802.15.1/D1.1 AND PRE-SUBMIT TO REVCOM • 3. IF IT FAILS OR REQUIRES ANOTHER RECIRC. - APPLY EDITS AND SUBMIT TO 2ND (SB3) IEEE SPONSOR RECIRCULATION BALLOT • Session #15/Austin • 4. MOTION FULL WG TO APPROVE FORWARDING P802.15.1 TO SEC • MOTION SEC TO APPROVE FORWARDING P802.15.1 TO REVCOM • 5. PROVIDE PROJECT PLANNING UPDATE -00/375r2 • 6. PROVIDE SESSION #16/DALLAS OBJECTIVES, IF ANY. Ian Gifford, Consultant

  8. Session #15/Austin – Submissions • Via flash and http://ieee802.org/15/pub/Download.html • 01/420r10 [01420r10P802-15_WG-SB1-SB2-802-15-1-Comment-DB.xls] • 01/451 TG1-Nov01 Meeting Objectives and Agenda xls Gifford • 01/457 TG1 Nov01 Minutes doc Gifford • 01/462 WG-TG1 Opening Report Nov01 ppt Gifford • Appendix A - 01/462r1a [01462r1aP802-15_WG-P802.15.1-RevCom-Submission.pdf] • 01/467 WG-Liaison Report Nov01 ppt Gifford • Draft Submissions, via http://ieee802.org/15/pub/SB2/SB2.html • Draft Std IEEE P802.15.1/D1.0.1 [99001D10P802-15-1__Draft_Standard.pdf] • "Change bar" Draft Std IEEE P802.15.1/D1.0.1[99001D10P802-15-1__Draft_Standard.pdf] Ian Gifford, Consultant

  9. Session #15/Austin – Graphic Ian Gifford, Consultant

  10. IEEE 802.15 Working Group for Wireless Personal Area Networks™ Sponsor Ballots (SBs) Summary Report Ian Gifford, Consultant

  11. SBs Summary Report • Sponsor Ballot #1, passed @89% • 30 Day Electronic Ballot • 27Jul01 Opened • 25Aug01 Closed • Sponsor Ballot #2, passed @89% • 10 Day Electronic Recirculation Ballot • 2Oct01 Opened • 11Oct01 Closed The BRC continues to communicate to the three (3) DISAPPROVING Balloters and we are happy to report that one (1) DISAPPROVING Balloter has reviewed the resolutions and changed his initial and recirculation vote from DISAPPROVING to YES WITH COMMENTS (see –01/420r10 Comment #7) on 12Oct01. This 3 to 2 change to the sponsor ballots up the affirmation to 93%. Ian Gifford, Consultant

  12. SB1 Summary Report • P802.15.1/D0.9.2 • Closing date: 2001-08-25 • The report is the result from the group: 0000130 • 1. This ballot has met the 75% returned ballot requirement. • 33 eligible people in this ballot group. • 26 affirmative votes • 3 negative votes • 1 abstention votes • 30 votes received • 90% returned • 3% abstention • 2. The 75% affirmation requirement is being met. • 26 affirmative votes • 3 negative votes • 29 votes • 89% affirmative Source: -01/420r10 Ian Gifford, Consultant

  13. SB2 Summary Report • P802.15.1/D1.0.1 Recirculation • Closing date: 2001-10-11 • This is a recirculation ballot. The report collates the results from the following groups: 0000130 0000169. • 1. This ballot has met the 75% returned ballot requirement. • 33 eligible people in this ballot group. • 26 affirmative votes • 3 negative votes • 2 abstention votes • 31 votes received • 93% returned • 6% abstention • 2. The 75% affirmation requirement is being met. • 26 affirmative votes • 3 negative votes • 29 votes • 89% affirmative Source: -01/420r10 Ian Gifford, Consultant

  14. SBs Summary Report (cont.) Source: -01/420r10 Ian Gifford, Consultant

  15. SB1 Summary Report (cont.) • Comment Resolution, as of 24Sep01 • 6 Balloters commented (Thanks!) • 95 new comments • 65 Editorial comments, 3 rejected • 30 Technical comments, 19 unresolved • Source for Application for approval of P802.15.1 • 01462r1aP802-15_WG-P802.15.1-RevCom-Submission.pdf • Page 10-30 of this submission contains the “Unresolved negative comments and rebuttal report” (19 of 95 unresolved) • Unresolved-negative-comments-and-rebuttal-report.pdf Source: -01/420r10 Ian Gifford, Consultant

  16. SB1 Summary Report (cont.) Source: -01/420r10 Ian Gifford, Consultant

  17. Comment Status (cont.) • The “C” in the Response Status column indicates that the comment (whether Accepted or Rejected) is considered CLOSED by the letter ballot comment resolution team. In the case of an AC, this means that the comment was accept, changes applied, and the comment is now closed. In the case of an RC, this means that the comment was not accepted, no change applied, decline letter sent, and the comment is now closed. • The “U” in the Response Status column indicates that the comment is UNSATISFIED by the letter ballot comment resolution team. The team has not been able to reach final closure on this comment due to a needed response from the Bluetooth Special Interest Group. This is not to be confused with the opinion (i.e. unsatisfied) of the original commenter. • The “Z” in the Response Status column indicates that the comment was WITHDRAWN by the original commenter and thus no further consideration by the letter ballot comment resolution team. Source: -01/420r10 David Cypher & Ian Gifford

  18. IEEE 802.15.1 Current Project Planning • Jul99 • Initial Discussion on Proposals. • Nov99 • Initial draft ready for WG ballot. • Jan00 • First Ballot complete, second ballot kicked off. • Mar01 • Jul01 • Draft ready for IEEE sponsor ballot. • Sep01 • Nov01 • Dec01 • Approval by IEEE Standards Board 802.15.1 Project Target & 802 Sponsor Expectation 26Oct01 Ian Gifford, Consultant

  19. Tentative Needs for Jan02 Interim • 21-25Jan02 (5 Days) • ~0 People TG1 leadership is not planning to attend the Jan02 Interim. Ian Gifford, Consultant

  20. Draft 0.0 - Tom Siep 100% Draft 0.1 - Tom Siep 100% Draft 0.2 - Tom Siep 100% Draft 0.3 - Tom Siep 100% 283 Pages Draft 0.4 - Tom Siep 100% Draft 0.5 - BT-IEEE Editorial Working Group 331 Pages 1 Chief Editor/6 Technical Editors 6 Bluetooth Promoter Company Reviewers w/ internal help ~300 Comments Draft 0.6 - BT-IEEE Editorial Working Group 308 Pages 1013 Comments Draft 0.7 – Tom Siep 100% 617 Pages Draft 0.7.1 - IEEE 802.15 Task Group 1 Technical Editors 803 Pages 1 Chief Editor/11 Technical Editors Draft 0.7.2 - IEEE 802.15 Task Group 1 Technical Editors 773 Pages 1 Chief Editor/11 Technical Editors 412 Comments Draft 0.7.3 – Jennifer Longman, IEEE-SA Project Editor 100% Draft 0.7.4 - IEEE 802.15 Task Group 1 Technical Editors Draft 0.8.0 - IEEE 802.15 Task Group 1 Technical Editors 1130 Pages 1 Chief Editor/7 Technical Editors 376 comments Draft 0.9.1 - IEEE 802.15 Task Group 1 Technical Editors 1159 Pages 1 Chief Editor/7 Technical Editors 71 comments Draft 0.9.2 - IEEE 802.15 Task Group 1 Technical Editors 1159 Pages 1 Chief Editor/3 Technical Editors 60 comments Draft 1.0.1 - IEEE 802.15 Task Group 1 Technical Editors 1165 Pages 1 Chief Editor/3 Technical Editors 0 comments Draft 1.1 - IEEE 802.15 Task Group 1 Technical Editors 1159 Pages 1 Project Editor 0 comments 802.15.1 Drafting History Ian Gifford, Consultant

  21. IEEE 802.15 Future Meetings • January 21-25, 2002, Dallas, TX USA, Wyndham Anatole, 802.15 Interim Meeting*. • March 11-14, 2002 St Louis, MO USA, Hyatt Regency, 802 Plenary Meeting. • May 13-17, 2002, Sydney, NSW, AU, Wentworth Sydney Hotel, Interim Meeting*. • July 8-11, 2002 Vancouver, BC Canada, Hyatt Regency, 802 Plenary Meeting. • September 16-20, 2002, Hyatt Regency Monterey, 802.15 Interim Meeting*. • November 11-14, 2002 Koloa, HI USA, Hyatt Regency Kauai, 802 Plenary Meeting. • More Info: • http://ieee802.org/15/pub/Meeting_Plan.html • http://ieee802.org/meeting/ Ian Gifford, Consultant

  22. More Info: • IEEE 802.15 • http://ieee802.org/15/ • Standards Process-at-a-Glance • http://standards.ieee.org/resources/glance.html Ian Gifford, Consultant

  23. In conclusion, the Project 802.15.1 would like to leave you with this slide  Ian Gifford, Consultant

More Related