The Miami Intermodal Center

The Miami Intermodal Center. September 23, 2009. Is Becoming a Reality!. The MIC Program. Current $1.7 billion program Major components Rental Car Center - 2010 MIA Mover - 2011 Miami Central Station - 2012 Roadways Improvement Program - completed Right of Way Program - completed

adanna
Télécharger la présentation

The Miami Intermodal Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!

  2. The MIC Program • Current $1.7 billion program • Major components • Rental Car Center - 2010 • MIA Mover - 2011 • Miami Central Station - 2012 • Roadways Improvement Program - completed • Right of Way Program - completed • Joint Development – pending

  3. Create connectivity in Miami-Dade County where none existed • Decongest roads leading to the county’s number one economic generator – MIA MIC Program Goals

  4. Roadway congestion • Operational deficiencies – flooding • Separate S.R. 836 & MIA traffic from major roadway traffic Why Major Redesign of Roadways Needed

  5. 2009 Solution • FDOT Reconstructed Roadway System • Total Cost $184 M • $13 M design • $154 M construction • $17 M CEI • MDX contributed to Right of Way • Design Engineering Firms • BHA Engineers • Kimley-Horn & Associates • Sanchez-Zeinali & Associates • T.Y. Lin International • URS Corporation • APCT Engineers

  6. BHA • Master Plan • Roadways/ Bridge Development Report (BDR)

  7. Kimley-Horn & Associates 2009 • Reconstruction of Le Jeune Road from NW 11th Street to NW 18th Street • Le Jeune Road Northbound Collector Distributor

  8. Sanchez-Zeinali & Associates • Bridge 10 A • Connects RCC to Le Jeune Road Southbound Collector Distributor

  9. T.Y. Lin International • Reconstruction of Le Jeune Road Southbound Collector Distributor • Connects MIA & South Le Jeune Road to S.R. 836

  10. URS Corporation 2009 • MIC-MIA Interchange • Le Jeune Road North from NW 18th Street to NW 31st Street

  11. A&P Consulting • MTAR Design • NW 21st Street • NW 25th Street • NW 38th Court • Transit Access Roads • Roadway Improvements • NW 14th Street • Drainage, Utility & Signage Master Plans

  12. MTAR Le Jeune Rd MIC-MIA Interchange Before After Roadway Improvements Program

  13. Le Jeune Road Reconstruction • Reconstruction of Northbound & Southbound Le Jeune Road • Eliminated flooding & frees corridor from expressway & airport traffic • Construction of New Le Jeune Road Northbound Collector Distributor • Reroutes traffic away from Le Jeune Road & provides direct connection from eastbound & westbound S.R. 836 to the MIC & MIA • Construction of New Le Jeune Road Southbound Collector Distributor • Separates airport traffic from local traffic on Le Jeune Road & connects existing MIA traffic with westbound S.R. 836 & southbound Le Jeune Road • Reconstruction & new construction of MIC-MIA Interchange including 11 bridges, ramps & access roads • Links MIA to north & southbound Le Jeune Road & RCC to Le Jeune Road

  14. Reconstruction of NW 25th Street from Le Jeune Road to NW 37th Avenue • Improves access to MIA, RCC & future MCS • Reconstruction of NW 21st Street from NW 38th Court to east of Le Jeune Road • Improves access to MIA, RCC & future MCS MIC Terminal Access Roads (MTAR) • Construction of at-grade and elevated roadways around RCC & MCS • Provides feeder roads & ramp access to RCC & MCS • Link with Le Jeune Road Corridor projects, providing a seamless connection to S.R. 836

  15. Maintenance of traffic during design & construction • Maintain uninterrupted access to MIA 24/7 • Sequence of construction with various roadway projects • Coordination with design teams, FDOT, MIA, MDT, MDX, Miami-Dade County, City of Miami, CSX Railroad track, C-4 Miami Canal, surface water permitting agencies (SFWMD & DERM), FPL Transformer Station & other utility companies • Design & construction of Bridge 10 -- 4 span structure on curved alignment using AASHTO beams with deck on superelevation transition • Prevalent flooding in area due to poor drainage conditions Roadways Improvement Program Challenges

  16. Enhances effective movement of people, goods & services – airport & expressway traffic rerouted • Increases transportation efficiency – more direct connections • Improves safety & accessibility – relieved congestion & eliminated flooding • Aids traffic management – dedicated access lanes • Enhances community life by providing a functional north-south artery in the heart of Miami-Dade County Roadways Improvement Program Benefits

  17. Le Jeune Road MTAR MIC-MIA Interchange Le Jeune Road Landscaping www.micdot.com