1 / 36

Pre-Incident Planning

William Rainey Harper College Fire Science Technology “A Commitment to Excellence”. Pre-Incident Planning. UNIT III: PRE-INCIDENT PLANNING I. Pre-Incident Survey 4STI-3.1. Pre-Fire Planning. Consists of entire process of gathering information Developing S.O.P.’s - S.O.G.’s, etc.

Télécharger la présentation

Pre-Incident Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. William Rainey Harper College Fire Science Technology “A Commitment to Excellence” Pre-Incident Planning

  2. UNIT III: PRE-INCIDENT PLANNINGI.Pre-Incident Survey 4STI-3.1 Pre-Fire Planning • Consists of entire process of gathering information • Developing S.O.P.’s - S.O.G.’s, etc. • Keeping information current • Different than code enforcement inspection: Do not combine

  3. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Pre-Incident Surveys • Conducted to provide emergency personnel information about occupancy • Concentrate on how fire will occur and behave • Focus on potential hazards: • Haz-Mat • High voltage • Unprotected openings

  4. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Pre-Incident Surveys • Update strategic plans and tactical procedures • Alarm assignments • Additional resources • Mutual aid

  5. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Pre-Incident Surveys • Prioritize building to survey • Life safety risk • Property risk • Other emergencies

  6. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Facility Survey Equipment • Equipment needed: • Writing equipment, clipboards, forms, etc • Drawing equipment, symbols • Flashlights, camera, measuring tape • Portable radio

  7. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Facility Survey Equipment • Personnel protection equipment • P.P.E.

  8. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Scheduling Pre-Incident Surveys • Times • Convenient for occupants • Get realistic picture of activities • Do not schedule right after code inspection

  9. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Public Relations • Positive image to the public • Always in uniform • Mercantile • Office • Institution • Industrial

  10. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Public Relations • Hazard occupancies • Coveralls • Helmets • Safety equipment

  11. UNIT III: PRE-INCIDENT PLANNINGII.Surveys 4STI-3.2 • Public Relations • Business like manner • Do not socialize • Be courteous

  12. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Benefits • Allows firefighter to become familiar with building • Allows firefighter to visualize and discuss how fire is likely to behave in structure • Identifies critical conditions • Information and training

  13. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Exterior Facility Survey • Walk outside first • Take measurements • Locate closest fire hydrants • Locate utilities shutoffs • Locate sprinkler standpipe connection

  14. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Exterior Facility Survey • Underground tanks • Ornamental facings • Building coverings • Doors, windows, fire escapes

  15. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Roof • Starting Point • Work down floors

  16. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Floor Plans • Fixed structures • Vertical shafts • Walls, partitions • Machinery • Fire protection equipment

  17. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Life Safety Concerns • Exits • Elevator, escalators • Windows, openings • Evacuation considerations • Areas of safe refuge • Flammable or toxic finishes

  18. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Potential Hazards • Flammable, combustible liquids • Toxic chemicals • Explosives • Reactive materials • Radioactive materials • Processes that are dangerous

  19. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Structure Conditions • Structural components that may fail • Materials that may loose strength • Ornamentals • Unsupported partitions, walls • Roof construction • Dangerous conditions • Stacked storage

  20. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Structure Conditions • Heavy objects (collapse) • Building features that may confuse/trap firefighter • Large open areas • Dead end corridors • Open vat pits • Openings to underground shafts/tunnels • Multi-floor arrangements

  21. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Structure Conditions • Mazelike conditions • Alterations from original structure

  22. UNIT III: PRE-INCIDENT PLANNINGIII.Conducting the Pre-Incident Survey 4STI-3.3 • Information gathered • Aids in risk management • Aids in fire ground decisions • Resource management

  23. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Company Officer’s Responsibility • Begins at company level • Forward complete, accurate written reports and information to supervisors

  24. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Two Schools of Thought • Type 1 • Essential building information only. • Easier and quicker to gather and formulate. • Type 2 • Extensive building information. • More involved and structured. • Used for more critical operations.

  25. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Standards for Pre-Planning • NFPA 903, Fire Reporting Property Survey Guide. • NFPA 1420, Recommended Practice for Pre-Incident Planning for Warehouse Occupancies. • NFPA 1620, Recommended Practice for Pre-Incident Planning.

  26. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Facility Survey Drawings • Building information • Plot plans • Floor plans • Elevation

  27. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Facility Survey Drawings • Field sketches • Rough drawing • General information about building • Hydrants, streets, exposures, etc. • Use graph paper; easier to draw

  28. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Facility Survey Drawings • Report drawings • Polished versions • Drawn to scale • Standard mapping symbols and legend

  29. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Facility Survey Drawings • Photography • Used to supplement plan • Good visible detail

  30. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Facility Survey Drawings • Written report • Basic information • Address of building • Date of inspection • Occupancy Type (institution, mercantile, etc) • Construction of building (I, II, III, IV, V) • Name of submitting officer

  31. UNIT III: PRE-INCIDENT PLANNINGIV.Developing Pre-Incident Plans 4STI-3.4 • Managing Pre-Incident Data • Computers (quick access and update) • Can be placed in the apparatus or radio room • Pre-Plan Books (less expensive and most common) • Can be placed in the apparatus or radio room • Keep updated information! • Critical to your operation. • Occupancies change…

  32. In Summary • Pre-planning lets you know what to expect before it’s on fire! • It allows you to determine possible strategy and tactics about the building. • Helps us reduce the possibility of injury or death to our Firefighters. • Firefighter Safety is #1…

  33. Questions ?

  34. 10-Minute Break

  35. Movie Presentation Engine Company Pre-Incident Planning

  36. Pre-Planning Buildings

More Related