1 / 20

Utility Line Permit ULP 417

. Zoning Map. Proposed Activities. Install approximately 21,000 feet of utility line along an abandoned rail road bed used for residential traffic. This is After-The-Fact.The proposed utility lines would set back more than 100 feet from the normal high water mark of Schoodic Lake at a height no greater than 40 feet.Total number of would be approximately 100, one every 230 feet and be screened by dense vegetation..

adin
Télécharger la présentation

Utility Line Permit ULP 417

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Utility Line Permit ULP 417 Applicant: Eastbrook Timber Co., Inc. Authorized Agent: Hartts Electric Location: Lake View Plantation Piscataquis County

    3. Zoning Map

    4. Proposed Activities Install approximately 21,000 feet of utility line along an abandoned rail road bed used for residential traffic. This is After-The-Fact. The proposed utility lines would set back more than 100 feet from the normal high water mark of Schoodic Lake at a height no greater than 40 feet. Total number of would be approximately 100, one every 230 feet and be screened by dense vegetation.

    5. Site Plan

    6. Site Photos

    7. more Site Photos

    19. Review Criteria continued landscaped so that they do not degrade natural values; and (c) located so as not to inappropriately encroach upon or change the character of remote areas, or produce an intensity of use that is inappropriate for a particular area.

    20. Conclusion Based upon the above Findings, the Commission concludes that, if carried out in compliance with the Conditions below, the proposal will meet the Criteria for Approval, Section685-B(4) of the Commission's Statutes, 12 M.R.S.A.

    21. Staff Recommendation Staff recommends approval for the 21,000 feet of utility line. The applicant has demonstrated Right Title and Interest and that there would be no adverse impacts to Schoodic Lake.

More Related