1 / 24

Capacity Building and Institution Formation

Capacity Building and Institution Formation. At Nagri KAUSHLENDRA KUMAR Technical Expert(CB/WM),SLNA-JSWM. Integrated Watershed Management Programme. INDIA’S SHARE IN GLOBAL RESOURCES Human Resource 16.0% Land Resource 2.45% Water Resource 4.00% Livestock Resource 15.0%.

adolfo
Télécharger la présentation

Capacity Building and Institution Formation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capacity Building and Institution Formation At Nagri KAUSHLENDRA KUMAR Technical Expert(CB/WM),SLNA-JSWM

  2. Integrated Watershed Management Programme

  3. INDIA’S SHARE IN GLOBAL RESOURCES Human Resource 16.0% Land Resource 2.45% Water Resource 4.00% Livestock Resource 15.0%

  4. Capacity Building • Capacity Building is the most vital element to achieve the desired results from watershed management programme • Common Guidelines have accorded higher priority to capacity Building under Paragraph 80-84 for Watershed development projects. • it is understood that Capacity Building is a continuous Process of upgrading knowledge and skills of the functionaries at different levels as well as different stages of Programme . • It does not stop as one time event and should be fulfilled from time to time during the course of the project planning. • There is need to streamline the capacity Building efforts at the SLNA,WCDC and WDT Level

  5. Indicative list of themes of Capacity Building 1.Awareness Generation and Social Mobilization 2Institutinal Building 3 Account Management 4 Participatory Planning and DPR Preparation 5Soil and Water Conservation 6Water Management 7 Livelihood and Micro Enterprises 8 Productive Enhancement 9Participatory GIS/GPS 10.MIS and MPR/AAP 11Monitoring 12Evaluation 13Convergence 14 Consolidation/Exit Policy 15 Other need based

  6. Joint Party Agreement between IGNOU-BAU and JSWM

  7. Diploma Watershed Management(DWM) • WC,Committee member and WDT has been prefered in this course . • With the active support from SLNA-JWSM, Programme is running satisfactory. • Exposure Visit has been undertaken in IWMP area so as to make them familiar with watershed project. • Provisioned to absorbe in IWMP

  8. Organization with strength in different component

  9. Institutional Arrangement at Divisional level

  10. Training of Para Engineers

  11. Students of BAU at the site of construction

  12. Name of Project – IWMP-VI/11-12 Village – Barpos Block - Manoharpur District – West Singhbhum Type of Work – EPA Name of Work – Well Renovation before and After

  13. Staggered Trench

  14. Thousand Have Lived Without Love, Not One Without Water

  15. JAI JALCHAJAN

More Related