1 / 16

All Hands Meeting March 2007

All Hands Meeting March 2007. http://www.lancs.ac.uk/cockcroft-institute/. R&D Investment. • RF: supply (incl CLIC+IFMIF) Lanc+ASTeC cavity (incl MICE+UKNF) Lanc(+IC) novel cavity surface R&D Lanc scRF Lanc+Man+ASTeC

adonia
Télécharger la présentation

All Hands Meeting March 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Hands MeetingMarch 2007 http://www.lancs.ac.uk/cockcroft-institute/

  2. R&D Investment •RF: supply (incl CLIC+IFMIF) Lanc+ASTeC cavity (incl MICE+UKNF) Lanc(+IC) novel cavity surface R&D Lanc scRF Lanc+Man+ASTeC •theory (incl CLIC) Lanc+Liv •ILC: e+ source+spin trantLiv+Durham+ASTeC damping rings Liv+ASTeC linac wakefields Man BDS layout+lattice design ASTeC+univs BDS collimnASTeC+Lanc+Man(+Brum) crab cavity Lanc+ASTeC •newly developing projects: EMMA: e non-scaling FFAG ASTeC+Man laser-plasma (ALPHA-X) Lanc+ASTeC FP420 at LHC + LHC commgMan

  3. Project •RF: supply (incl CLIC+IFMIF) Lanc+ASTeC cavity (incl MICE+UKNF) Lanc(+IC) novel cavity surface R&D Lanc scRF Lanc+Man+ASTeC •theory (incl CLIC) Lanc+Liv •ILC: e+ source+spin trantLiv+Durham+ASTeC damping rings Liv linac wakefields Man BDS layout+lattice design ASTeC+univs BDS collimnASTeC+Lanc+Man(+Brum) crab cavity Lanc+ASTeC •newly developing projects: EMMA: e non-scaling FFAG ASTeC+Man laser-plasma (ALPHA-X) Lanc+ASTeC FP420 at LHC + LHC commgMan ? ? ? ? ?

  4. ERLP Chirped beam compression ~100 fs FEL included CI students + pdocs +ASTeC

  5. Energy Recovery scRF  low loss  energy recovery - deceleration = acceleration phase – 180o - reversible electrodynamics - energy recovery  cavity RF Δt = 1/RF

  6. EMMA ERLP+EMMA  ATF ? ERLP  energy recovery - light source (4GLS) - beam-beam (CLIC) ERLP + EMMA  non-scaling FFAG - large emittance pre-acceleration (NF, µµ) - table top MeV ATF CI students + pdocs +ASTeC

  7. Next Generation Light 600 MeV, 100 mA 750-950 MeV, 1 kA Scope under (cost) review - synchronised (10 fs) -multi-source -IDs, FELs energy storage and manipulation ring CI students+pdocs +ASTeC

  8. The Future Energy Frontier? the CLIC trick time 0.9 GHz -drive RF MV 5 MV/m -bunched beam atklystron-delivered RF powerinst -bunch compression -resonant wake-field coupling 30 GHz -higher RF  150 MV/m @ higher RF powerinst -secondary beam acceleration

  9. Funding Continuity ? “business plan” = expert faculty univs appointing 6½ 9½  12½ + core research 7 9  15 + project research 11  >14 > 17 + students > 15(+3) 2008 ? } +matching growing expert demand lack ofcontinuity of responsive funding lamentable number of core studentships (2!) definitely not as planned ! threat to “mission”  “imaginative” approachs !

  10. CI PG students = business plan ? = E&T mission ?

  11. Summary and Conclusion CI progressing to maturity -acknowledged internationally (collaboration) -leadership roles -hands-on accelerating system(s) scientific programme growing (SAC input) -strategy responsive to changing world -able to focus at right moment -niche strengths already appearing (SAC) -substantial output high quality staff being recruited -growing demand for responsive projects -crucial to mission: STFC ?

  12. Summary and Conclusion industrial KE in very early stages -excellent individual examples (RF eng) -coherence of RDA+RC agenda? -how really to engage industry ? -how really to enable industry? -european industry coherence? substantial E&T program -in-house systems (ERL, large emittance) more high quality students should be funded

  13. Agenda Thursday March 30th 11:00 Introductory remarks, context John Dainton 10 mins 11:10 RF technology (and MICE+NF+scRF) 90 mins (incl discussion) Achieving excellence in AST research Richard Carter 15 mins MICE RF R&D Joe Orrett 15 mins 4GLS SRF Cryomodule R&D John Strachan 15 mins Crab cavity control system Imran Tahir 15 mins High efficiency RF sources for IFMIF & CLIC Richard Carter/Carl Beard 15 mins 12:40 Lunch 13:30 The Theory Group 100 mins Introduction Robin Tucker 10 mins   Guided Fields from Ultrarelativistic Sources David Christie  20 mins   Maxwell's equations and Charged Dust Volker Perlick 20 mins    Looking for axions in waveguides Adam Noble 20 mins Vlasov Treatment of Coherent Synchrotron Radiation from Arbitrary Planar Orbits Gabriele Bassi 20 mins 15: 10 LHCOverview of FP420 RF Studies and More Roger Jones 20 mins 15:30 Tea/Coffee 15:50 EMMA: Electron non-scaling FFAG 60 mins (incl discussion) CONFORM project Roger Barlow 15 mins EMMA: the overall design Hywel Owen 15 mins EMMA magnets Neil Marks 15 mins 16:50 Laser-plasma (ALPHA-X round 1 and now 2) Mark Wiggins 30 mins 17:20 Discussion: round 1

  14. Agenda Friday March 30th 9:00 ILC 90 mins (incl discussion) Crab cavity for the ILC Philippe Goudket 15mins Polarised positron source update Alison Birch 15mins Overview of collimator studies Adina Toader 15 mins Prospects for simulating complete ILC modules and eliminating trapped modes Ian Shinton 15 mins Coupled bunch instabilities in the ILC DRs Kai Hock 15 mins 10:30 Tea/Coffee 10:50 ERLP and 4GLS 90 mins (incl discussion) Commissioning ERLP & simulations David Holder 15 mins Accelerator Physics on 4GLS Peter Williams 15 mins High average current photoinjector for 4GLS Julian McKenzie 15 mins The 4GLS VUV-FEL Neil Thompson 15 mins 12:20 Concluding remarks, issues, horizons John Dainton/Mike Poole Discussion round 2

  15. Discussion • education and training • seminars and colloquia • funding • STFC • EUFP7 • EPSRC • strategy • modus operandi • - coherence • - hands-on seamlessness • - building • - KE • - funding status • details of hand-over to “new management” • ?

  16. Getting it right …… most of the time! there are three C’s in CoCkCroft ! CERN Courier Jan 2007 …but two R’s ?!

More Related