1 / 7

December 2012 Generation Resource Energy and Regulation Deployment Performance

December 2012 Generation Resource Energy and Regulation Deployment Performance. QWMG 1/8/2013. NON-IRR GREDP – Energy Deployments. Resources below 85% threshold. * Failed intervals occurred during testing while using the Shutdown RST. IRR GREDP. Resources below 95% threshold. IRR >= 95%.

adrian-hahn
Télécharger la présentation

December 2012 Generation Resource Energy and Regulation Deployment Performance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. December 2012 Generation Resource Energy and Regulation Deployment Performance QWMG 1/8/2013

  2. NON-IRR GREDP – Energy Deployments Resources below 85% threshold * Failed intervals occurred during testing while using the Shutdown RST

  3. IRR GREDP Resources below 95% threshold

  4. IRR >= 95%

  5. IRR < 95%

  6. IRR < 95% Continued

  7. GREDP Scenario Analysis

More Related