Design Build Delivery Model

Design Build Delivery Model. January 31, 2012. Design Build (DB). …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by the owner, completing the detailed design, and proceeding into construction.

adsila
Télécharger la présentation

Design Build Delivery Model

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design Build Delivery Model January 31, 2012

  2. Design Build (DB) …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by the owner, completing the detailed design, and proceeding into construction.

  3. Benefits of Design Build • DB offers the following: • Poses Least amount of Project Risk to Owners • “Quickest” Project Delivery Method • Early Construction concurrent with Design • “Integrated” DB Team develops design with constructability in mind, which: • Reduces Changes / Change Orders to Project • Reduces need for Value-Engineering / Re-Bidding • Improves quality of Final Design • Can be used on any sized Project • Use of Design Assist Contractors during design

  4. Challenges of Design Build • Minimizes Owner Control over Process • May be Difficult Method to Use on Complex Projects • Building Over-Design may Increase DB Profits • …Did the Owner get the Best Price for the final Product?

  5. Roles in Design Build • Criteria Architect (C-AE) – Defines Design Intent through Schematic Design, selected through co-selection process by owners • Project Cost Consultant (PCC) - Third Party Entity that advises Owner related to Project Cost while in Design and assists in GMP Negotiation, selected by the co-owners • Design Builder (DB) – Provides input in Design, Negotiates GMP, Bids Project and Oversees Construction • Architect of Record, General Contractor • Design Assist Contractors – usually MEP

  6. Overview of Design Build - Design • Team consists of Criteria Architect (C-AE) and Design-Builder (DB): Criteria Architect / Owner’s Representative Criteria Architect Design Begins (POR) Design Intent Finalized (SD) Design Ends (GMP) Design Builder: • Architect of Record • General Contractor • Design Assist Contractors

  7. Overview of Design Build – Construction • Design-Builder (DB) bids project and oversees construction, with the C-AE serving in an Owner’s Representative (OR) function: Criteria Architect / Owner’s Representative Construction Begins (GMP) Construction Ends Design Builder: • Architect of Record • General Contractor • Subcontractors

  8. Selecting a Delivery Model • Each District/Project is Unique in Some Fashion • Construction Experience • Knowledge of Program • Community Involvement • Decision Making • Scope • Complexity • Schedule

  9. What Owner Fits Design Build? • Owner Familiar with Construction Programs & Processes • Owner Availability of Staff (Moderate Level) • Single Decision Maker • Owner Risk Tolerance (Low Level) • Owner Level of Control (Low Level) • Original Design vs. Project Changes • Level of Changes to Original Scope • Original Schedule vs. Project Changes • Level of Changes to Original Schedule

  10. What Project Fits Design Build? • Medium to Large Projects (> $2 million) • Simple to Moderate Complexity of Projects • Design & Schedule • Aggressive Schedule Expectations

  11. Design Build…Project Sequence • Establish and Procure Project Funding • Determine DB Delivery is best method • Co-Selection of C-AE – RFQ Process • Co-Selection of PCC – RFQ Process • Co-Selection of DB Team – RFQ/BVS process, Includes: • Selection of DB – RFQ/BVS process • Two Step Selection Process • Negotiation of GMP • Occurs between SD & DD Phase • Re-Confirmation of GMP to Design Intent • Bidding • Pre-Qualification of Potential Bidders by DB • DB bids and awards Contracts, may perform work • Construction & Closeout

  12. Design Build…GMP Negotiation • Occurs between SD and DD Design Phases • Small, Select Group from District & OSFC • Cost Estimate from DB / Design Assist Contractors • Cost Verification from Project Cost Consultant • Conduct Facilitated Session for Negotiation • Upon GMP Agreement, Design Intent is revisited

  13. Design Build…Prequalification • Experience • Financial condition • Performance on previous projects • Facilities • Management skills • Ability to contract properly • Goals • EDGE etc. • Affirmation of non-violations past (5) years • Proof of licenses to perform work • Self-Performance