An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Telescope Optical Units (TOUs) Overview of the TOU Team organization during PLATO 1.0 & TOU timeline and plans during phase B1/B2 TOU Team Meeting Catania 11 June 2014 Isabella Pagano (TOU PM)

  2. ICU R. Cosentino TOUs during PLATO 1.0organization Payload PLATO Payload Management PIPM: P. Bodin Instrument System Coordinator P. Levacher DPS Management B. Pontet Camera Management D. Laubier TOU R. Ragazzoni Normal TOU R. Ragazzoni Normal DPU Ph. Plasson Fast TOU W. Benz Hardware & boot software M. Mas FPA/FEE D. Walton/M. Mas Application software Ph. Plasson Fast DPU G. Peter Prototype & FM AIV P. Levacher Algorithms R. Samadi AEU S. Fredon TOU Meeting

  3. TOUs during PLATO 1.0organization N-TOU and F-TOU delivered by IT in the PLATO 2.0 plan

  4. TOUs during PLATO 1.0Our mandate Provide optical – mechanical design performing as required by Science Compliant with the assigned budget Feasible in the due time Reliable in the given environments TOU Meeting

  5. TOUs during PLATO 1.0How we managed A large team: • INAF • Padova • Catania • Milano • Univ. Bern • Stockolms Obs. • Univ. Firenze • Industrial Partners • Selex • Medialario-Sagem • Seso • RUAG • APCO Technologies TOU Meeting

  6. TOUs during PLATO 1.0How we managed • A huge number of meetings/telecons: • TOU Team • Bilateral TOU-System Teams • TOU-FPA System Teams A large team: • INAF • Padova • Catania • Milano • Univ. Bern • Stockolms Obs. • Univ. Firenze • Industrial Partners • Selex • Medialario-Sagem • Seso • RUAG • APCO Technologies TOU Meeting

  7. TOUs during PLATO 1.0How we managed Breadboard/Prototype • Design (Optics, Mechanics, Thermal, ..) • Demonstration Activities • TOU AIV procedure • TOU Optical and Thermal Performances • TOU Optical Lenses Procurement • Feasibility Studies • TOU MAIT and Management Plan • TOU optical coating plan • TOU aspherical lens manufacturability & procurement plan • TOU AlBeMet® Structure Procurement Plan TOU Meeting

  8. BreadBoard/Prototype “pre-breadboard” the structure built with off-the-shelf lenses used to test GSE and procedures to be used with the breadboard. “breadboard” the structure built to test alignment in warm and cold environment before the I-PRR “prototype” the structure built after the I-PRR, during the Phase B1 (in the PLATO 1.0 context) , obtained from the breadboard, replacing the L1 and L2 lenses. TOU Meeting

  9. TOUs during PLATO 1.0What we delivered - Officially At I-PRR (deadline April 2011) PMC TOU plans Source: TOU Team - Date: 4 May 2011 PLATO TOU Project Management Plan: Source: Selex, 20 April 2011 PLATO TOU MAIT Plan: Source: Selex, 20 April 2011 PLATO aspherical lens (ref.11-6219 ed03): preliminary technical, management proposal– Source: Medialario/Sagem-Reosc, 3 May 2011 PLATO Coating - Source: Selex, 22 April 2011 PLATO TOU Design Report: Source: TOU Team, Date 18 April 2011 - included in the 02_Payload-design-report_draft11.pdf TOU Meeting

  10. TOUs during PLATO 1.0What we delivered – Unofficially 1/2 Not included in any package to ESA but delivered to CNES and O. Piersanti (former ESA PM) between March and July 2011: CaF2 lens blank: Thermal Vacuum Test Report - Filename: PLATO-CAMTOLE-RP-154-CNES, Issue 1, Rev. 0, Date: Jul 21st 2011, Prepared by: H. Pasquier - delivered to Piersanti Vibration Test Report: L3 CaF2 Vibration Test Dummy - Filename: Test_509_PLATO_dummy_lens_mount__report.pdf - Authors: M. Greber, D. Piazza, K. Seiferlin, P. Christiansen, 20th Jun 2011 - delivered to CNES and Piersanti PLATO TOU Breadboard/Prototype: Design and AIT Reportfilename: PLATO-INAF-TOU-RP-0013-issue02-rev0-2.pdf- Authors: J. Farinato, V. Viotto, D. Piazza et al., Issue 2, Rev. 0, Date: 13 Jul 2011 - delivered to CNES and Piersanti TOU Meeting

  11. TOUs during PLATO 1.0What we delivered – Unofficially 2/2 AlBeMet® Structure Procurement Report - author "APCO Technologies” – delivered to CNES on May 12 2011 Study on the aspherical lens performed by RUAG - delivered to CNES oo 18 Jul 2011 Less relevant… PLATO TOU - Letter of Interest - author: SAGEM/REOSC - delivered to Osvaldo Piersanti (ESA) (March 2011) PLATO TOU - Letter of Interest - author: SESO - delivered to Osvaldo Piersanti (ESA) (March 2011) TOU Meeting

  12. TOUs during PLATO 1.0What we left open • Optical Design Consolidation • see Magrinpresentation for details • Breadboard activities • see Farinato et al. presentation for details • Mechanical Design • Finite Element Model of the current mechanical design, including evaluation of the first eigenfrequency. • Interfaces • Verification of the interfaces of the finite element model with the lenses and their effects. • Filter design • Engineering consolidation TOU Meeting

  13. PLATO 2.0    TOU 2.0 TOU Meeting

  14. PLATO 2.0 timeline – Phase B2Jul 2014-Jan 2016 Premises • Phase B1 kick-off: Jul 2014 • Science Management Plan approval: Nov 2015 • Payload Development and Consolidation Review: March 2015 • SRR data package: 1 Nov 2015 • SRR: completed by Jan 2016 • Mission adoption & IPC approval: Feb-Mar 2016 TOU Meeting

  15. PLATO 2.0 timeline – Phase B2C/D/E1Q1 2016-Q1 2024 Premises • Industrial ITT for Phases B2/C/D/E1: Apr-Sep 2016 • Industrial Prime contractor kick-off: Oct 2016 • System PDR: by 2017 (tbc) • System CDR: by mid-2020 (tbc) • Payload CDR by 2018 (tbc) • Delivery of all Cameras: Q4 2021 • PLATO Launch: Q1 2024 TOU Meeting

  16. Phase B1: SRR Objectives 1/2 Premises • PLATO Phase B1 objective is the adoption of the PLATO mission by SPC in Feb-March 2016. • The PLATO System Requirements Review (SRR) to be completed by January 2016 is a major input to PLATO mission adoption. • The SRR is a formal review (category 1 i.e organized by ESA inspector general, D/SRE is the chairman). • The primary objective of the SRR is to review in detail: • The final payload and spacecraft system specifications, • The payload and spacecraft design definition, • The payload and spacecraft development and verification program, • Mission programmatic and cost. TOU Meeting

  17. Phase B1: SRR Objectives 2/2 Premises ?? • The camera development schedule is critical, and is actually defining the schedule critical path for the spacecraft. Hence: • The camera detailed design activities (including AIV plans and Ground System Equipment design) shall be completed before the SRR, • The critical bread-boarding activities (e.g. electronics Demonstration Models, optics) shall be initiated during phase B1, • Consortium input to the SRR shall demonstrate that the camera Engineering Model - which is fully representative of the flight model except for some electronics parts - will be completed by early 2017, • A detailed development plan of the payload shall demonstrate by SRR that: • serial production phase will start by mid-2017, • the first batch of 8 cameras will be delivered in November 2020, • the last batch of cameras will be delivered by November 2021. TOU Meeting

  18. TOUs during PLATO 2.0Phase B1 goal Our proposal: deliver all ready but undelivered documents: • Design: • Consolidated TOU Design Report (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) • Breadboard: • ConsolidatedBreadBoard AIV report • NEW: including a critical review of results and assessment of some open issues • CaF2 tests • AIV Design: • Consolidated TOU MAIT and Management Plan • ConsolidatedAlBeMet® Mechanical Structure Procurement Assessment Study • NEW: F-TOU Filters Design Procurement Assessment Study

  19. TOUs during PLATO 2.0Phase B2 goal • Design: • Engineering of TOU Design (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) • Breadboard  Prototype • Lens set like the FM one (change of 2 lenses and replacement of one lens previously accepted with no conformance issue because short in time • optical quality test (in term of PSF shape and dimension) on the whole FoV. • AIV Design: • Finalized TOU MAIT and Management Plan • FinalizedAlBeMet® Mechanical Structure Procurement Study • Consolidated: F-TOU Filters Design Procurement Assessment Study TOU Meeting

  20. When Industrial Prime Contractor? Our proposal: • During Phase B1, industry will deliver consult and services. • We’ll work to have ASI delivers a ITT for Phase B2/C contract, not later than March 2015. • Goal: • TOU Prime Contractor at work at beginning of Phase B2, but clearly identified before the SRR. TOU Meeting