1 / 26

WP 16 Central Information System MyOcean2 First Annual Meeting – Cork /16-17 April 2013

WP 16 Central Information System MyOcean2 First Annual Meeting – Cork /16-17 April 2013. Work Package Main Objectives. MyOcean Information System (MIS). Work package objectives: Develop MyOcean CIS Operate MyOcean CIS

akina
Télécharger la présentation

WP 16 Central Information System MyOcean2 First Annual Meeting – Cork /16-17 April 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 16Central Information System MyOcean2 First Annual Meeting – Cork /16-17 April 2013

  2. Work Package Main Objectives MyOcean Information System (MIS) • Work package objectives: • Develop MyOcean CIS • Operate MyOcean CIS • Participate to transition from one release to next one, with service continuity • Develop and/or advocate some non central components (for distributed DUs) CIS User Interface System (UIS) MFC TAC Users

  3. CIS Sub-system MyOcean Information System (MIS) • CIS sub-system: One of the 67 MyOcean sub-systems (42 PUs + 24 DUs + 1 CIS) • Project information and communication • Provides to MyOcean Users a common catalogue to access product Discovering, Viewing, Downloading and information about product s (Quality, User manual, …) • Provides interfaces and support to Producers to describe products and services in the MyOcean catalogue • Provides means to manage MyOcean Users • Monitors the products, the sub-systems and users. And provides Monitoring dashboards and reports User Interface System (UIS) Product Managers Users Service Desk, Service Managers

  4. MyOcean Gateways • MyOcean Gateway (because dissemination function is geographically distributed ) • Provides View functionalities • both for • Provides Download functionalities • Gridded products • In Situ products • Along track products CIS PC PUs MIS DUs View Download Users

  5. Partnership Central Information System WP16 Operation & Service Lead WP16.1 CLS Operations WP16.2 Service WP16.3 Science& Technology WP16.4 R&D WP16.5 Implementation & TransitioningWP16.6 CLS CLS Ifremer Ifremer CLS Ifremer Ifremer U-Read U-Read Altamira CLS CLS Ifremer URead

  6. V3 Challenges identified at Kick off • Neither easy nor good for relationship • CIS design in parallel of Top-level design • Incremental & parallelisation of CIS implementation • Establish stronger links with technical Community (Unidata, ...) (not enough) • V2 operational maintenance • And V3 implementation At same time ! • And V4 design • Change Web-portal host (without outage) .... Let’s see on Tuesday

  7. V3 Achievements (1/16)Search • Re-designed search page • with additional criteria/menus • + Keyword search

  8. V3 achievements (2/16)Search results • Search results page improvements • Search refinement on search result page • Keyword highlighted after keyword search

  9. V3 Achievements (3/16)Viewing

  10. V3 Achievements (4/16)Viewing / product description Access to Product description from the Viewing interface

  11. V3 Achievements (5/16)Viewing / All datasets Dataset selection within the Product Spec

  12. V3 Achievements (6/16)Viewing / Transect Transectdiagram plots

  13. V3 Achievements (7/16)Viewing / Time series plots Time series plots

  14. V3 Achievements (8/16)Polar stereographic projection North and South polar stereographic projection

  15. V3 Achievements (9/16)Viewing OpacitySelection Overlay showing a latitude-longitude graticule

  16. V3 Achievements (10/16)MyOcean FTP Classic FTP with user login/password => Transaction Accounting

  17. V3 Achievements (11/16)Transaction accounting Reports Logs on DUs + Web-portal Transformation Cross analysis Statistic Reports Dashboards

  18. V3 Achievements (12/16)Product editing

  19. V3 Achievements (13/16) Product description CIS – Central Information System

  20. V3 Achievements (14/16)Processing Information • Product Availability • Product Timeliness

  21. V3 achievements (15/16) Upstream product editing

  22. Upstreamproducts V3 Achievements (16/16) Link with Upstream products Describe link between MyOcean Products and Upstream products

  23. V3 AchievementsSynthesis • Web-Portal • Search and Product page improvements (1ststep) • Access to products • Subsetting of NETCDF-4 files (input) • FTP with central authentication and Transaction Accounting • View of In Situ products (Océanotron) • Viewing of all datasets • View : Transaction accounting • Information System • User administration improvement • First steps to facilitate product and access-service changes (Geonetwork) • Product dependency Dashboard • Collaboration with SeaDataNet • User administration (same login/password), Gateway, Vocabularies, .. V3.x • Operation & Service Management • Redundancy of all CIS components….. Partially, V4 V3.x V3.x V3.x

  24. V4 Main objectives (1/2)User interfaces • Search and product pages (2nd step) • Dynamic information for Users: Timeliness and Availability • Better integration of Search, View and Download interfaces • Single GUI for all download • Sub-setting and View of In Situ Products • Sub-setting and View of Along Track products • NETCDF-4 compatibility (view and download)

  25. V4 Main objectives (2/2) • Information System • Improvement of catalogue management (2ndstep) • Better management of static and dynamic information • More and advanced monitoring dashboard and reports • Better product dependency Dashboard • Collaboration with SeaDataNet • User administration (same login/password), • Gateway, • Vocabularies • Operation & Service Management • Full redundancy of CIS components

  26. Thank you

More Related