1 / 20

RIVERSIDE ELEMENTARY SCHOOL

RIVERSIDE ELEMENTARY SCHOOL. West Contra Costa Unified School District. CalTrans Overpass. MARCH 12, 2013. SALLY SWANSON ARCHITECTS, INC . WWW.SWANARCH.COM. AGENDA. Introduction Needs Assessment Review Interchange Modifications at I-80 and San Pablo Dam Road Questions and Answers.

Télécharger la présentation

RIVERSIDE ELEMENTARY SCHOOL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RIVERSIDE ELEMENTARY SCHOOL West Contra Costa Unified School District CalTrans Overpass MARCH 12, 2013 SALLY SWANSON ARCHITECTS, INC. WWW.SWANARCH.COM

  2. AGENDA • Introduction • Needs Assessment • Review • Interchange Modifications at I-80 and San Pablo Dam Road • Questions and Answers

  3. INTRODUCTION

  4. Presenters PRINCIPAL, CEO:Sally Swanson, AIA

  5. NEEDS ASSESSMENT

  6. Existing School Site CA. Dept. of Education Standard = 10 Acres Site Approx. = 5.925 Acres

  7. Riverside E.S.

  8. Riverside E.S.

  9. REVIEW INTERCHANGE MODIFICATIONS AT I-80 AND SAN PABLO DAM ROAD

  10. Interchange Modifications

  11. Interchange Modifications

  12. Interchange Modifications

  13. SITE ANALYSIS

  14. Parking Parking Lots and Spaces • Design not to ADA codes: • Path of Travel • In vehicular way • No designated path • Location to Administrative • Entrance – 380 feet • Accessible space not • compliant • Not Van accessible • Aisle not on passenger • side +/- 380 Ft. POT

  15. CalTrans Overpass Modification CalTrans Overpass • Overpass designed location: • Crossing I-80....Positive • Four story structure • creates danger zone • Location hides parking • Loss of 3 spaces Danger Zone +/- 380 Ft. POT Fire Lane

  16. Security Security • Security concerns on school grounds: • Critical issue: • Cars, Copper piping, & Computers • Parking - Pedestrian movement in conflict • Campus needs to be contained • Disabled access in conflict with vehicular • traffic Danger Zone +/- 380 Ft. POT Fire Lane

  17. Acoustics Overpass Barriers • Overpass designed location: • Landscaping removed • adjacent to freeway • Served as an Acoustical • Barrier

  18. Sale of Property Sale of Property New Overpass Location • Alternate CalTransOverpass location • Future value of site not compromised • Need for Site Design Integration & Master Plan

  19. Conclusion Danger Zone +/- 380 Ft. POT Fire Lane

  20. QUESTIONS AND ANSWERS

More Related