SlideServe
Menu
Préférences
© SlideServe · v2026

Team _ - Jan 18 2005

alain avatar
9 diapositives · 266 Views · Oct 12, 2014

Team _ - Jan 18 2005. Project Goal. The Goal The goal of our project is to create a working and user friendly simulation of the AODVS system The secondary goal is to improve upon the existing system by adding timeouts on SID packets (intrusion detection). Design Revisions.

Team _ - Jan 18 2005 - slide 1
01 / 9Team _ - Jan 18 2005
1 / 17

Télécharger la présentation

Team _ - Jan 18 2005
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Team _ - Jan 18 2005

  2. Project Goal • The Goal • The goal of our project is to create a working and user friendly simulation of the AODVS system • The secondary goal is to improve upon the existing system by adding timeouts on SID packets (intrusion detection)

  3. Design Revisions • Through discussions both with the professor and amongst the group the design has changed in several ways • Nodes will be told when to move, but not where to move, by the Monitor class • Our thoughts on the visualization of network traffic have changed more than once, and may change again

  4. Design Revisions (cont) • The Monitor class has had more things moved and added to it for coordination between the various layers of our program • External lookup tables for node and packet types have been added • “Big Picture” remains the same as in original designs

  5. Risk Analysis • Timing • Movement handled by coordinating through the Monitor and not leaving it up to the nodes • Cryptography • Pushed off until later, possibility of not getting to it • AODV algorithm not fully implemented or implemented incorrectly • Used an Internet Draft from Univ. of Calif.

  6. Schedule • This week • Monitor will be done • 50% of packets implemented and working • Visualization of these packets • Week 7 • Other 50% of packets implemented • Tokens working to tell good nodes from bad • Authority class working to start up system

  7. Schedule • Week 8 • Bad nodes implemented • Detection system in place to detect bad routing and dropping packets • Week 9 • Final testing and debugging • Trials to see if our improvement has worked • Week 10 • Evaluation and report

  8. Demo!