An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Skilled Trades 1211

  2. Masonry /Ceramic Tile Installation

  3. Overview

  4. References:Carpentry & Building Construction(Pages 855-871)

  5. Modem Carpentry (463-483)

  6. Product Installation Pamphlet supplied by the manufacturerInternet References

  7. Limitation:Two persons per group

  8. Approximately XXClasses(Subject to adjustments)

  9. Tools and Materials:

  10. Stationary /Portable power toolsLayout Tools

  11. Motorized Mitre SawClaw Hammer

  12. Hole Saw KitTile Saw (Wet Saw)

  13. Rod SawTile Nippers

  14. SquareMixing bucket

  15. Grout FloatTile CutterNotched Trowel

  16. Instructions:

  17. All students are required to complete an assigned research assignment before attempting to fabricate the assigned building component.Once you have completed the research assignment pass in the finished document for gradingand you will be given information detailing the building component your group will be expected to complete.

  18. Project requirements

  19. ALL STUDENTS MUST COMPLETE ONE RESEARCH ASSIGNMENT AND A MINIMUM OF ONE “Hand’s” On Assignment__________Research assignment (All students must complete this assignment)

  20. __________ Wall/ floor section with ceramic tileinstalled

  21. __________ Completed concrete form with concrete sample set

  22. Order of Procedure

  23. Complete the research assignment on the assigned topic.

  24. Sketch a diagram of the floor section to be coveredby group.

  25. Estimate the materials required to complete this activity.

  26. Have your teacher check the estimated materials needed.

  27. Install ceramic tile on wall/floor section

  28. Mix and install the ceramic grout.

  29. Notify your teacher you are ready to be graded

  30. Finish Up

  31. After you have completed work on the assigned building component notify your teacherthat you are ready to move on to the next project.If time permitsyou may be asked to constructanother project at this station.

  32. After you have completed your project(s)store all usable materials and tools for the next groupto visit this station. Be sure to place your name(s) on the completed work.

  33. After your teacher has completed the grading of this work you will be required to tear down the station in preparation for the next group.

  34. Hardwood/Ceramic FlooringInstallation

  35. Instructions: The following directions are meant to offer direction to complete this work. It is not practical toproduce a set of instructions that could be followed for every problem that could be encountered when working through this station.

  36. Installation of Hardwood Flooring.

  37. Using the floor and wall section supplied divide the floor section in half by drawing aline down the center from the protruding wall to the outside edge of the floor. One half will be used to install the hardwood flooring and the other half will be used to install the ceramic tile.

  38. Begin with the hardwood flooring for best results. Place a mark ½ inch from the wall along the length of the wall and snap or draw a line using a chalk line or straight edge.

  39. Measure and cut a piece of flooring underlay to fit over the section of the floor that will be covered by the hardwood flooring. Use a staple gun to secure the underlay in place being careful not to cover the mark.

  40. Select a hardwood floor strip that is true (straight) then use a brad nailer or 1½ inch finishing nails to facenail this piece onto the floor½ inch from the grove edge of the strip and a second nail ½ inch from the tongue edge of the strip.