In a crisis, about 235,000 seek shelter, 435.25 tons of supplies needed, 76,000 lack water, 330,000 without power. 300 deaths, 6,500 injuries, 68,500 buildings damaged, 250 bridges affected.
Kentucky Emergency Assessment and Response Overview
E N D
Presentation Transcript
Kentucky Assessment Overview • Approximately 235,000 people will seek shelter • Estimated 435 25 Ton truckloads of commodities (water, ice, MREs) will be required to support the at risk population • Over76,000 households are without potable water service • Nearly330,000households are without electric power(Day 1) • There are approximately6,500 injuries and300 deaths • Approximately68,500 buildings are damaged • Over250 bridges are damaged Source: Mid-America Earthquake Center – Hazus Model 2010
Kentucky Emergency Management Command and Control Plan JRSOI - Air Louisville Commonwealth Emergency Operations Center – Frankfort Unified Area Command, Regional Emergency Coordination Center Owensboro JRSOI - North Elizabethtown State Unified Area Command, Regional Emergency Coordination Center Greenville Unified Area Command, Regional Emergency Coordination Center Paducah JRSOI – North Alt Lexington Unified Area Command, Regional Emergency Coordination Center Hopkinsville SAR Coordination Point Bowling Green JRSOI - South Bowling Green JRSOI – South Alt London
TF Jackson - Paducah Kentucky National Guard Command and Control Plan XX XX JFACC – SDF- Air Base Louisville JFHQ – Frankfort JTFHQ – Greenville - WHFRTC JRSOI - North Elizabethtown x TF River - Owensboro JRSOI – North Alt Lexington x x TF Pennyrile - Hopkinsville SAR Coordination Point Bowling Green JRSOI - South Bowling Green JRSOI – South Alt London
Health & Human Service/Mass Care Command and Control Plan Owensboro Ambulance Strike Team/Task Force X 13 DMAT Type I - Basic X 11 DMAT Type II - Mental Health X 1 Federal Medical Station (FMS) X 1 NDMS Management Team X 1 Type I DMAT - Crush Injury X 1 Department of Public Health DOC - Frankfort Mayfield DMAT Type II - Mental Health X 1 Benton DMAT Type II - Mental Health X 1 Paducah Ambulance Strike Team/Task Force X 10 DMAT Type I - Basic X 12 DMAT Type II - Mental Health X 1 Federal Medical Station (FMS) X 2 National Disaster Medical Systems (NDMS) Management Team X 1 Type I Disaster Medical Assistance Team (DMAT) - Crush Injury X 2 Hopkinsville Ambulance Strike Team/Task Force X 14 DMAT Type I – Basic X 20
Kentucky Logistics Plan Owensboro LSA (River Port) Base Camp Evacuation Center Madisonville Contingency Response Group (CRG) FARP – Rotary Wing Supply Paducah LSA Base Camp Evacuation Center ISB Hopkinsville LSA Base Camp Evacuation Center Ft. Campbell ISB – Federal State - LSA