1 / 24

Presentation by Ministry of Water Resources

Presentation by Ministry of Water Resources. National Conference on Agriculture for Rabi 15 th September 2005. Presentation Design. Irrigation Development in India Objectives, Achievements and Constraints of CAD programme Restructured CADWM Programme Features Financing Pattern

aldon
Télécharger la présentation

Presentation by Ministry of Water Resources

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation by Ministry of Water Resources National Conference on Agriculture for Rabi 15th September 2005

  2. Presentation Design • Irrigation Development in India • Objectives, Achievements and Constraints of CAD programme • Restructured CADWM Programme Features • Financing Pattern • Reclamation of Waterlogging in Commands • Status of PIM in India

  3. Irrigation Development In India

  4. Water as a Resource • Total Surface Water Resource – 1869 BCM • Utilizable Water Resource (BCM) • Surface - 690 • Ground - 432 • Total - 1122 • Storage (BCM) • Existing - 221 • Pipeline - 84 • Proposed - 113

  5. Irrigation Development in India

  6. Objectives, Achievements and Constraints of CADWM Programme

  7. Objectives • Bridge the Gap Between Potential Created and that utilised through • Micro Level Infrastructure Development • Efficient Farm Water Management Practices • Optimization of Agricultural Productivity & Production and • Improvement in Socio-economic Conditions of Farmers

  8. Achievements • Initiated in 1974-75 & Restructured in 2004-05 • Programme taken up in 310 projects 162 closed, 23 clubbed into 8 and now 133 continuing • CCA of 28.5 Mha Included – 17.05 completed • Warabandi included in 11.03 Mha • Field Drains covered in 1.54 Mha • Central Assistance of Rs. 2879 crores released till June 2005

  9. Need to Restructure Constraints of OLD CAD Programme • Unreliability of water supply at outlet • Gap between available technology and Adoption • Lack of participation of farmers • Lack of Conjunctive use • Lack of sufficient Financial Outlay • Water logging / Drainage congestion • Absence of Link/Intermediate Drains • Administrative Reasons

  10. Restructured CADWM Programme(2004-05 Onwards)

  11. Restructuring • Renamed as Command Area Development and Water Management Programme • Retains components beneficial to farmers • Includes new components essential for correcting system deficiency and improving drainage • Excludes components which lost utility over time

  12. Continuing Components Survey, Planning and Design Field Channels (with 10% Beneficiary Contribution) Full Package OFD Works (with 10 % Beneficiary Contribution) Construction of Field, Intermediate and Link Drains Enforcement of Warabandi Restructuring Contd…

  13. Restructuring Contd… Continuing Components …. • Reclamation of Waterlogged Areas (with 10% Beneficiary Contribution) • Training, Adaptive Trials, Demonstrations, Monitoring & Evaluation (75% Funding) • Institutional Support to WUAs • Establishment • R&D

  14. Restructuring Contd… New Components • Correction of System Deficiencies • Renovation and Desilting of Tanks in CAD Commands for augmenting supplies • Bio-Drainage (Selective Areas)

  15. Components Deleted Land Leveling & Shaping Sprinkler & Drip Irrigation Conjunctive Use Crop Compensation Restructuring Contd…

  16. Restructured Programme - Thrust Areas • Beneficiaries Participation in Construction and O&M • Water management above, at and below farm level • Reclamation of Waterlogged Areas • R&D on Bio-drainage • Adaptive Trials/Demonstrations and Training • Strengthened Monitoring and Evaluation Mechanism • Emphasis on Data Collection, Analysis and Dissemination

  17. Financing Pattern

  18. Financing Pattern • Construction Activities - 50:50 • Software Activities - 75:25 • Minimum 10% contribution by beneficiaries • Construction of field channels • Reclamation of water logged areas • Desilting and renovation of MI tanks • Action Research on PIM through WALMIs /Other Central/State Agencies • Cost Norms Enhanced

  19. Reclamation of Waterlogging in Commands

  20. Reclamation of Waterlogged Areas in Irrigated Commands • Total Area Affected by Water Logging – 2.46 Mha (1991)

  21. Status of PIM in India

  22. Objectives of PIM • To achieve equity in water distribution • To improve water use efficiency • To make best use of rain, surface and ground water conjunctively • To increase irrigation facility and cropping intensity • To develop community responsibility to collect water charges and raise internal resources • To create a sense of ownership of water and irrigation system among users

  23. Status of PIM in States • Advanced stage of implementation (Legislation Enacted) • Andhra Pradesh, Goa, Karnataka, Madhya Pradesh, Tamil Nadu, Rajasthan, Orissa, Kerala, Maharashtra, Bihar • Midway stage (Bills framed) • Gujarat, Chattisgarh • Some headway (Initial Stages) • UP • No headway • NE States, Punjab, Himachal Pradesh, J&K, Haryana, Uttranchal, Jharkhand, West Bengal So far, more than 55,000 WUAs formed covering an area of about 10 mill. ha. all over the country

  24. Thank You

More Related