SlideServe
Menu
Préférences
© SlideServe · v2026

Task Group Process Overview for TGac Development

aleach avatar
6 diapositives · 105 Views · Dec 20, 2019

An in-depth look at the typical task group process involved in TGac development, including steps, controlling documents, considerations, and references. Key elements such as PAR construction, RFP issuance, proposal selection, and document revisions are highlighted.

Task Group Process Overview for TGac Development - slide 1
01 / 6Task Group Process Overview for TGac Development
1 / 17

Télécharger la présentation

Task Group Process Overview for TGac Development
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Task Group Process Overview Authors: Date: 2008-11-12 Darwin Engwer, Nortel Networks

  2. Abstract An overview of the typical task group process as it relates to TGac. Darwin Engwer, Nortel Networks

  3. Overview of Task Group Steps • Form Study Group (SG) • Study (is the task feasible?) • Construct PAR • Form Task Group (TG) • Staff the task group • Chair • Secretary • Leaders for the 4 controlling docs • Prepare controlling docs • Issue RFP • Hear proposals • Select from amongst proposals • Internal review of draft (letter ballot) • Incremental revisions(1) - as challenges/ opportunities are uncovered • External review of draft (sponsor ballot) • Incremental revisions(2)? - as challenges/ opportunities are uncovered • Publish draft as an 802.11 amendment Darwin Engwer, Nortel Networks

  4. Controlling Documents (envisioned) • Functional requirements • Channel models • Comparison criteria • Selection procedure • Recommend prioritizing that list (in the order shown) • Although some can be done in parallel • Preferred completion order is as shown Darwin Engwer, Nortel Networks

  5. Other Considerations • Discuss/ agree upon TG working process. • When issue CFP? • Identify work areas that can be developed in conjunction with VHT60: • MAC functions, e.g. “session mgmt” • Space-time channel management Darwin Engwer, Nortel Networks

  6. References • 11-08-1392-00-0vht-inputs-for-a-vht-selection-procedure.ppt • 11-08-1036-05-0vht-september-report.ppt • 11-08-0579-01-0vht-towards-an-improved-proposal-development-process-for-vht.ppt • 11-08-0807-04-0vht-below-6-ghz-par-nescom-form-plus-5cs.doc Darwin Engwer, Nortel Networks