1 / 10

Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu

Logframe. Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu. Adjustments - Logframe. Logical Framework: In most of cases needs the improvement!!! Work with the Applicant on it – to make it consistent with the Description of the Action

Télécharger la présentation

Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Logframe ConsultationseminaronthepreparationoffullApplicationFormfor LSP 6 December 2011, Tartu

  2. Adjustments - Logframe • Logical Framework: • In most of cases needs the improvement!!! • Work with the Applicant on it – to make it consistent with the Description of the Action • Ideally a contract to be signed with a proper Logical framework: • It will help to the Applicant and partners in Action’s implementation • Will serve to the monitoring purposes • But keeping it aside the contract and still using for monitoring purpose could also be an option

  3. Logframe – project design logic

  4. Logframe – adjustments logic

  5. Logframe – verification logic

  6. Logframe • A different, ”third” logic of working! • Identify which parts of the AForm corresponds to each level of the Logframe • Start from Results and Outputs • The most important part, usually more or less well formulated • To be checked against AForm, formulations adjusted if needed • Normally shouldn’t change during the project implementation, whereas Activities could be adjusted • How do you reflect Outputs, which are not in the Logframe but are undispensable to formulate the Results?

  7. Logframe • When the results are formulated, check the Activities, which contribute to them (passing by Outputs) • Make sure that all the activities are attributed to a Result • The Activities are sufficient to achieve the results • Check that indicators are SMART (Specific, Measurable, Achievable, Relevant, Time-bound) • Realistic indicators • Check sources of verification... • Risks/assumptions very important! • Ex: reducing polution of the river by 20%, but it’s poluted upstream

  8. Logframe - verification • Is the vertical logic complete and accurate? • Are the indicators and sources of verification available and reliable? • Are assumptions and preconditions realistic? • Are risks acceptable? • Is the probability of achieving the objectives high? • Are programme principles taken into account? (cross-border impact, equal opportunities, etc.) • Are the expenses justified by the expected benefits?

  9. FurtherInformation JOINT TECHNICAL SECRETARIAT Phone: +371 6750 9520 Fax: +371 67509523 E-mail: info@estlatrus.eu Ausekļa Street 14 – 3rd Floor, Riga, LV-1010, Latvia

  10. Thank You for attention! 10

More Related