1 / 14

DMS v2.1

DMS v2.1. March 2012. - Nov 2001 DMS launched - Mar 2004 Site DMS launched - Oct 2008 DMS 2.0 launched Mar 2012 DMS 2.1 launched. DMS Schedule.

aliza
Télécharger la présentation

DMS v2.1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DMS v2.1 March 2012

  2. - Nov 2001 DMS launched - Mar 2004 Site DMS launched - Oct 2008 DMS 2.0 launched Mar 2012 DMS 2.1 launched DMS Schedule

  3. In end of 2006, further development of DMS was implemented to handle documents other than correspondence. That was DMS 2.0 and it was upgraded to DMS v2.1 on March 2012.It is our next generation of DMS. Our first target is DRAWINGS because drawings are an important piece of instrument in the construction industry for proceeding of works. DMS v2.1for drawings is a centralized system to index, file and manage the incoming and outgoing drawings in digital format. This document outlines the drawing proposal prior to execution on site. Drawing Management Introduction

  4. - Centralized system to index and file drawings - Manage the incoming and outgoing drawings in digital format - To provide an electronic backup of the originals - To eliminate misfiling and loss of drawings - To significantly reduce search time for filed drawings Advantages

  5. - To indicate physical location of the archived drawings - Easy retrieval of drawings - Instant sharing of information - Proper record of drawings Advantages

  6. - Drawings can be viewed and maintained in the drawing register - Revision control - Display revision / issue history of any drawing - View drawings images - Search facilities - Archiving facilities Features

  7. - Hardcopy Archive Database - Linkage to Project Database - Name List Database - Get Part Plan and Sketch No. - Get Outgoing Reference No. Linkage Database

  8. Site Operation Drawing Coordinator shall handle : Drawing Registration Information Stamp chop Stick serial number label Scan A4 to A3 size drawing Arrange to scan over A3 size drawing by vendor onto CD Key Points

  9. Site Operation Drawing Coordinator shall handle : Arrange copies and distribution Indexing drawing Get Part Plan / Sketch No. Original hardcopy drawing Sent to Head Office for archiving Key Points

  10. Drawing Management Workflow DRAWINGS Drawings received / issued at site Stamp / stick barcode The drawings are scanned and uploaded and made one additional drawing copy at Site Office >A3 drawings are digitized by external vendor into one CD copy and one additional drawing copy The additional drawings copy will be kept at Site Office, and original drawings will be delivered to HEAD OFFICE for archiving Site Office Head Office Original drawing Archived by Sec Dept. Indexing J J I Additional Copy

  11. DMS v2.1 System Architecture Hardcopy Archive Search Reference No Receiver Log Drawing No Project Database View Scanning Indexing INTERNET / INTRANET ENTERPRISE DOCUMENT & DRAWING MANAGEMENT

  12. - H200605 HKCEC Expansion Project - H200715 A&A Works at Des Voeux Road C - H200807 Kwai Chung Logistic Centre Redevelopment Launch on October 2008 Pilot Projects

  13. Demonstration

  14. Q & A

More Related