An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operations and Production Management • Group 6: • Travis Lawrence • David Evans • Kerry Savoury

  2. Operations and Production Management THEORY OF CONSTRAINTS (TOC)

  3. What is TOC? • “An approach to management that focuses on whatever impedes progress toward the goal of maximizing the flow of total value-added funds or sales, less discounts and variable costs”

  4. History of TOC • A relatively recent development (20 years) • Developed by Eliyahu Moshe Goldratt, an Israeli physicist, educator, and management specialist • Became involved to help a friend who operated a plant that made chicken coops to design a scheduling system

  5. History of TOC (cont’d) • His system tripled the output of the plant • Goldratt released (1984) the philosophy underlying the scheduling algorithm in a book, The Goal: A Process of On­going Improvement

  6. What is a Constraint? • A constraint is anything in an organisation that limits it from moving toward or achieving its goal • For most business organisations the goal is to make money

  7. Types of Constraints • Two basic types of constraints: • Physical constraints • something like the physical capacity of a machine • Non-physical constraints • something like demand for a product or a corporate procedure

  8. Types of Constraints Examples of Constraints: • Demand Constraints • A constraint on output • Symptoms include: • large amounts of final product inventory • a production line running at a fraction of full capacity production

  9. Types of Constraints • Demand Constraints (cont’d) • A demand constraint means that the system has excess capacity given the demand for its product • Possible problems for demand might include: • a problem with marketing in which the customers are unaware of the system’s high quality product • the system may have a low quality product • the system may be producing an obsolete product

  10. Types of Constraints • Demand Constraints (cont’d) • In order to resolve the issue of excess capacity, each of the previous three problems need to be examined and resolved

  11. Types of Constraints • Production Constraints • Production constraints are issues that impeded a systems ability to achieve its maximum capacity • In-process inventories between production steps is often a symptom of a production constraint

  12. Types of Constraints • Production Constraints are categorised into three types: • Policy constraints • Company or union policies or practice create the constraint and impede its long-term solution • It is the most frequent constraint • Machine capacity constraints • When a single (or small number of machines) on a line form a bottleneck

  13. Types of Constraints • Labour constraints • Insufficient labour (not having a skilled operator) • The general labour pool is insufficient to run a line to full capacity, including extra shifts if needed

  14. Types of Constraints • Raw Material Constraints • Raw material constraints are shortages in the raw materials necessary in making the product • This is why a relationship with one's vendors is so important

  15. Applying TOC • The Theory of Constraints has been used at three different levels: • Production Management • Initially applied here to solve problems of bottlenecks, scheduling, and inventory reduction

  16. Applying TOC • Throughput Analysis • TOC has caused a shift from “cost-based” decision making to decision making based on “continuous improvement of processes” • Some key elements are: • System throughput • System constraints • Statistically determined protective capacities at critical points

  17. Applying TOC • Logical Processes • A general application to attack a variety of process problems within organizations • It is applied: • To identify what factors are limiting an organization from achieving its goals, • To developing a solution to the problem, • To get the individuals in the process to invent the requisite changes for themselves

  18. The Process of Change • The traditional approach to a process change shows that local optimization does not work well for good of the overall system • A system can only operate as fast as it’s bottleneck

  19. The Process of Change • Goldratt briefly outlined a process of change in 1990 • He characterized it as: • What to change • What to change to • How to cause the change

  20. The Process of Change • Approached by the 5 following rules: • Define the system. • Define the goal of the system. • Define the necessary conditions. • Define the fundamental measurements. • Define the role of the constraint(s).

  21. Implementing TOC • There are five steps involved in implementing TOC: • Identify • Exploit • Subordinate • Elevate • Repeat

  22. Identify – find the neck in our hourglass $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Implementing TOC • Identify the system's constraints • Prioritize the processes so that just the constraints that really limit the system’s progress are identified

  23. Implementing TOC • Decide how to exploit the system's constraints • Decide how to manage the constraint within the system • Then manage the resources to provide what is needed to match the output of the constrained resources • Never let them supply more output than is needed

  24. $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ • Decide how to exploit the system's constraints Expoit – remove any blockages from the neck Exploit – improve the value of the output

  25. $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Implementing TOC • Subordinate everything else to the system’s constraint • The constraints are keeping us from moving toward our goal • Apply all of the resources that we can to assist in breaking the constraint Subordinate – there is no point in forcing more in. It won’t come out any quicker

  26. $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Implementing TOC • Elevate the system's constraints • Continue to work toward breaking a constraint (also called elevating a constraint) • At some point the constraint will no longer be a constraint • The constraint will be broken Elevate:Make the hole bigger!!

  27. Implementing TOC • If the constraint is broken, return to Step 1 • There will be another constraint, somewhere else in the system that is limiting progress to the goal

  28. Implementing TOC Concluding: • The process must be reapplied, perhaps many times • TOC does not try to eliminate all problems, only those that threaten the constraint • Excessive effort in problem elimination is a waste

  29. Implementing TOC • Advantages: • Improves capacity • Avoids build-up of inventory • Avoids local optimization • Improves communication between departments

  30. Implementing TOC • Disadvantages: • Negative impact on non-constrained areas • Diverts attention from other areas that may be the next constraint • The constraint must be kept operating at its full capacity

  31. Operational Measurements • TOC defines three operational measurements that measure whether operations are working toward that goal • Throughput • The rate at which the system generates money through sales

  32. Operational Measurements • Inventory • All the money the system invests in things it intends to sell • This is the total system investment, which includes not only conventional inventory, but also buildings, land, vehicles, plant, and equipment

  33. Operational Measurements • Operating Expenses • All the money the system spends in turning inventory into throughput • This includes all of the money constantly poured into a system to keep it operating, such as heat, light, scrap materials and depreciation

  34. Current Research • It is currently being refined and expanded at the Avraham Y. Goldratt Institute (named after Dr. Goldratt's late father) • The Goldratt Institute publishes The Theory of Constraints Journal on an irregular, approximately quarterly, basis