1 / 5

GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents Electrical Test procedures and status EGSE Hardware configuration Flight PDU/ EM GASU/ ACD Integration flow Brian Grist Integration and Test

Télécharger la présentation

GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope • GLAST Large Area Telescope: • Integration and Test -Electrical Test- Phase 0 TRR • Key Requirements Documents • Electrical Test procedures and status • EGSE Hardware configuration • Flight PDU/ EM GASU/ ACD Integration flow • Brian Grist • Integration and Test • SLAC

  2. Key I&T Requirement Documents Requirements Definition Key to Successful I&T

  3. IFCT Electrical Procedures and Status 25 of 26 electrical test procedures complete 1 in draft waiting further test definitions

  4. EGSE Hardware configuration Phase 0 EGSE configuration the same as the past tower integration, with the addition of a Flight PDU, HIBs, and cables Flight Hardware

  5. Flight PDU/EMGASU/ACD Integration Sequence Install Flight PDU Route and Safe to Mate Cables Install HIBs Route and Safe to Mate Cables Install EM GASU 1120 Route and Safe to Mate Cables TEM/TPS Connection and turn on tests CAL and TKR CPTs Ready for testing with ACD installed Route ACD Cables Route Internal ACD Cables ACD Installation ACD Safe to Mate A 93 step Assembly Instruction Data Sheet (#1767) is complete and approved to perform this sequence

More Related