1 / 18

Eygene Ryabinkin, on behalf of KI and JINR Grid teams

Eygene Ryabinkin, on behalf of KI and JINR Grid teams. Russian Tier-1 status report. May 9th 2014, WLCG Overview Board meeting. KI: ATLAS status. Production activity since 2012 Preparing ourselves for analysis since March: evaluating data access protocols

alpha
Télécharger la présentation

Eygene Ryabinkin, on behalf of KI and JINR Grid teams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eygene Ryabinkin,on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting

  2. KI: ATLAS status • Production activity since 2012 • Preparing ourselves for analysis since March: evaluating data access protocols • Acting as Tier-2, since ATLAS needs MoU and pledges to start Tier-1 activities • Receiving 500 TB of job logs for tape storage since mid-April, 78 TB were successfully stored to tape

  3. KI: ALICE status • Running ALICE activities as disk-only Tier-1 since December 2013 • Providing 720 CPU cores and 150 TB of disks (can add more, once current usage will reach 70%, now we're at 25%) • Running with average efficiency of 83% • Tape instance will be rolled out once we will settle down with ATLAS in the tape realm

  4. KI: LHCb status • Running in MC-only mode since November 2013 • Disk-based dCache instance is ready and being validated • Mean job efficiency is 90% • 61.5 million of HS06-hours since the beginning of operations (42% of all CPU capacity, provided by RRC-KI-T1)

  5. KI: networking status • Using 2 Gbit/sec channel to GEANT and LHCONE (transit from NORDUnet) • Peering with ESnet on LHCONE space, Internet2 should come soon • Establishing peering with SARA/NIKHEF (physical transport is ready, waiting for 100G link between SARA and NIKHEF, ETA is next week)

  6. KI: networking status • Connected to LHCOPN since April 22th 2014 via CERN: 10 Gbit/sec link from Moscow to Amsterdam • Second LHCOPN circuit (Moscow — Budapest — Amsterdam) is ready, but waiting for Wigner DC last mile fiber • Exchanging traffic on LHCOPN with all other Tier-1 sites, but FNAL (should be fixed next week)

  7. KI: networking status • Peering with all big Tier-2 sites in Russia: JINR, IHEP (Protvino), ITEP, PNPI • Have direct peering with R&N networks: RBnet, RunNET and Radio-MSU • Establishing HEP traffic exchange point at M9 facility • Creating Russian VRF for LHCONE: RRC-KI-T1 and RRC-KI are pilot sites

  8. KI: assorted pictures

  9. KI: plans • Reach resource capacity promised in 2013: 54000 HS06, 4.8 PB disks, 5.7 PB tapes • Create 24x7 admin/monitoring team that will do most Tier-1 operations autonomously • Sign MoU and start working as Tier-1 • Grow networking capacity and links

  10. JINR: current state • Our Tier-1 currently supports CMS as the tape-less Tier-1 since October 2013; • Our resources were fully validated; • Our Tier-1 participate in CMS Multicore job scheduling project: • Able to run multicore glideins (12-cores) through ce{01,02} mcore queues by April 29th • Large scale tests at Tier1s: Start asap • Our Tier-1 was tested for high memory (6GB) jobs

  11. JINR: installed services Computing field: 1200 cores (17K HS06), Torque/Maui, 2xCREAM CE Storage: Disk-only dCache (running v2.6), 450 TB; has xrootd-federation working plugin dCache for MSS (v2.2), 130 TB pools + 72 TB tapes FTS 2.2.8 PhEDEx 4.1.2 for disk-only dCache and MSS Argus server 2x Frontier Squids site BDII and top-level BDII UI, MyProxy, WMS, LB, LFC for internal testing All services run EMI-3

  12. JINR: running jobs

  13. JINR: reliability and availability

  14. JINR: CMS link validation

  15. JINR: status at CMS SUM portal

  16. CMS T1 Site Activity

  17. JINR: future work • Engineering infrastructure (New UPS and climate control system – July-Aug) • High-speed reliable network infrastructure with provisioned path to LHCOPN • Computing and storage system basing on servers, disk arrays and tape libraries of high capacity (Sep) • 100% of reliability and availability

  18. Grid'2014 conference in JINR June 30th — July 5th 2014, Dubna, Russia Everyone is invited to join and do some talks http://grid2014.jinr.ru/

More Related