An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Senior’s Regulator Meeting Session II - Specific Challenges in Implementing Remediation Small Scale Post-Accident Remediation Ivan P. Salati de Almeida Director of Radiation Protection and Nuclear Safety Brazilian Nuclear Energy National Commission- CNEN September 2012

  2. The accident of Goiania - Brazil Distances Goiania-Brasilia=173 km Goiania-S.Paulo=937 km Goiania-R.Janeiro=810 km Brasilia Goiania R.Janeiro S.Paulo

  3. Location • City: Goiania (Capital of the State of Goias) • Population: ~1.000.000 inhabitants (at the time of the accident) • Teletherapy equipment with Cs-137 source • Day of the accident: September 13th,1987

  4. Impacted area

  5. CS-137 source characteristics • Source activity (Sept/87): 1375 Ci (50.9 TBq) • Chemical composition: caesium chloride (CsCl) • Physical condition: compacted powder • Mass CsCl: 93 g • Mass Cs-137: 19.3 g

  6. Chronology • September 10th to 13th,1987: part of a teletherapy equipment with a caesium-137 source was removed from an abandoned building and opened, breaching the caesium capsule. • September 13th to 28th: the Cs-137 was distributed to other people and was spread through other places in the city. Several people were hospitalized with symptoms of high doses irradiation. • September 28th to 29th: the accident was confirmed by a medical physicist and first actions were taken by local authorities. • September 29th to 30th: CNEN was notified and sent experts to Goiania.

  7. Main issues to be dealt with in the accident • People monitoring and assessment of environmental contamination • Medical care for victims (irradiated and contaminated) • Re-establishment of the source control • Decontamination of the places • Interim storage for the waste generated • Definition and construction of a repository

  8. Monitoring people Olympic Stadium (112,800 persons monitored)

  9. Data from the accident • Monitored persons = 112,800 • Contaminated persons = 271 • clothes and shoes = 120 • body contamination = 151 • People with deterministic hazards = 28 • Victims hospitalized = 20 • Syndrome of acute radiation = 8 • Hazards in bone marrow = 4 • Deaths = 4

  10. Main contamination foci

  11. Data from the accident • 7 main contaminated places • 42 additional contaminated places • 85 contaminated houses; 7 demolished • 50 vehicles decontaminated • Aerial survey with helicopter equipped with • radiation detector (67 km2 monitored) • Terrestrial survey with a car equipped with radiation detector

  12. Data from the accident • Equipment: • 55 dose rate meters, • 23 contamination monitors • 450 dosimetric pens • Professionals involved: • 250 technical staff • 300 support staff • Time • First period: September 29thto December 24th 1987 • Second period: January to end of March 1988

  13. The main piece of the source 0.4 Sv/h at 1m (~120 Ci) Emergency shielding

  14. Decontamination work Site isolated for decontamination

  15. Decontamination work • 57th Street • Place where the source was opened

  16. Decontamination work • House and land contaminated • Dose rate 1,1 Gy/h at 1m

  17. Decontamination work

  18. Decontamination work

  19. Decontamination work equipment head

  20. Decontamination work • Assignment of contaminated areas • Criteria (0.5 Sv/h)

  21. Criteria for decontamination • 5 mSv first year • 1 mSv/y dose for the whole life • Critical path for exposition: • Gama exposition inside home • Gama exposition outside home • Internal dose due to inalation and ingestion of fruits, vegetables, domestic animals

  22. Remediation actions • Part of the soil was removed and covered with concrete • Part of the soil was removed and substituted with non contaminated soil Contaminated trees were cut down

  23. Waste resulted from the accident • 3,500 m3 (6,000 Ton.) • 1,343 metallic boxes • 4,223 drums (200 liter each) • 10 maritime containers • 8 Concrete cylinders VBA type

  24. Interim storage of waste

  25. Interim storage of waste

  26. Interim storage of waste

  27. Final Repository

  28. Final Repository • Deposit 1 (common waste < 90 years) Store about 40% of waste (very low activity). • Deposit 2 ( 300 years) • Dimensions: • Wall thickness: 25 cm • Basis surface distance from the soil level: 80 cm • Length: 54 m • Width: 14 m • Height: 4 m

  29. Final Repository

  30. Final Repository

  31. Final Repository

  32. Final Repository

  33. Final Repository

  34. Final Repository

  35. Final Repository • Regional Center for Nuclear Sciences Information Building