1 / 31

Test Well Facilities

2. Texas Tech Test Well Facilities. Department of Petroleum EngineeringLubbock, Texas. 3. Texas Tech Test Well Facilities. The purpose of the Test Well Facilities is:(1) to provide the faculty with a location for training undergraduate students in oil field operations. These facilities will be integrated into the Natural Gas and Production Engineering Laboratory curriculum. (2) to provide the Texas Tech University with a research facility for full-scale testing and development of oil and29843

alva
Télécharger la présentation

Test Well Facilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 1 Test Well Facilities

    2. 2 Texas Tech Test Well Facilities Department of Petroleum Engineering Lubbock, Texas

    3. 3 Texas Tech Test Well Facilities The purpose of the Test Well Facilities is: (1) to provide the faculty with a location for training undergraduate students in oil field operations. These facilities will be integrated into the Natural Gas and Production Engineering Laboratory curriculum. (2) to provide the Texas Tech University with a research facility for full-scale testing and development of oil and gas production technologies.

    4. 4 Texas Tech Test Well Facilities Oil field Production Facilities (Design, and Installation) Tanks Separators Heater Treaters Production Piping Standards (ASME B31.3) Operations Well completion Technologies (Wellhead and Wellbore Tubulars) API Measurement Standards (API MPMS) (Thieving, Sampling, Hydrometers, Quantity, and Quality) LACTS Work-over Rig Procedures Down-hole tools (packer, anchors, mandrels, ports, etc.) Safety and Rig Practices

    5. 5 Texas Tech Test Well Facilities Artificial Lift Design and Optimization Beam Pumping (Pump Slippage, Rod Dynamics, Pump-Off Control) Plunger Lift (Plunger Run time, Fall Rates, Pressure Requirements) Gas Lift Installation (Valve Setting and Pressure Differentials) Instrumentation Acoustic Well Sounding Temperature Surveys (Fiber Optic Distributed Temperature Survey) Production Smart Well Technologies Fluid Flow Dynamics (Multiphase) Development of Accurate multiphase flow gradient curves Heavy Oil Production Techniques Thermal Methods PCP Technologies Ball Pump Technologies

    6. 6 Texas Tech Test Well Facilities TTU Property (East Loop 289, Lubbock) (8.7 acre tract)

    7. 7 Texas Tech Test Well Facilities TTU P-5 Organization Report (Texas Railroad Commission)

    8. 8 Corporate Project Sponsors Drilling Contractor

    9. 9 Corporate Project Sponsors Surface & Production Casing 4087.8 ft, 9-5/8, 43.5 #/ft, N-80, API 8rd LT&C, Range 3 316 ft., 13-3/8, 48.00 #/ft, H-40, API 8rd ST&C, Range 3

    10. 10 Corporate Project Sponsors Drilling Location Preparation

    11. 11 Corporate Project Sponsors Casing Crew Services

    12. 12 Corporate Project Sponsors Rat Hole, Mouse Hole, Anchors, Conductor Pipe

    13. 13 Corporate Project Sponsors Cementing Services (Surface Casing and Production String)

    14. 14 Corporate Project Sponsors Cementing Services (Cement Float Equipment)

    15. 15 Corporate Project Sponsors Drilling Bits 17 in. mill tooth bit (Surface Hole) 12-1/4 in mill tooth bit (2000 ft) 12-1/4 in. button bit (2000 ft 4000 ft)

    16. 16 Corporate Project Sponsors Open Hole Logging

    17. 17 Corporate Project Sponsors Coring Services

    18. 18 Corporate Project Sponsors Drilling Fluids Program

    19. 19 Corporate Project Sponsors Pipe Dope (Casing)

    20. 20 Corporate Project Sponsors Cased Hole Logging Services

    21. 21 Corporate Project Sponsors Surface Casing Head, Production Casing Head Dual Completion Tubing Head (5M Rating)

    22. 22 Corporate Project Sponsors Sucker Rod Pumping Unit C456D-305-144

    23. 23 Corporate Project Sponsors Inertial Guidance Rate-Gyroscopic Survey

    24. 24 Corporate Project Sponsors Separation Facilities Two-Phase 1440 psi Separator, and Low Pressure Heater Treater

    25. 25 Corporate Project Sponsors Gas Compression Two-Stage Ajax DCP-140

    26. 26 Corporate Project Sponsors Sucker Rod Pumping Surface Equipment

    27. 27 Corporate Project Sponsors Controllers for ESP and Sucker Rod Pumping Motors

    28. 28 Corporate Project Sponsors Polish Rod and 4020 ft Sucker Rod String

    29. 29 Texas Tech Test Well Facilities Conclusions The Department of Petroleum Engineering is working to secure corporate donations for the required surface production equipment. We estimate that we will have the Texas Tech Test Well Facilities operational by June 2003. In addition to equipment donations, the Department of Petroleum Engineering is planning to contact major integrated oil companies about conducting research with us in order to sponsors graduate student education.

    30. 30 Texas Tech Test Well Facilities Conclusions The department has contacted ATMOS Corporation in order to connect to their existing natural gas pipeline. The primary purpose for the gas connection is to: Fuel surface facilities. Commingle gas with oil and water to measure multiphase pressure drops. Demonstrate and measure the effectiveness of Gas Lift installations. Demonstrate the operating principles of Plunger lift installations.

    31. 31 Texas Tech Test Well Facilities Conclusions Upon project completion, we want to advertise the facility and publicize its corporate sponsors. We hope that the Texas Tech University Test Well Facilities will become one of the premier Educational and Production Research Facilities in the nation.

    32. February 7, 2003 Version 14.00 32 Texas Tech Test Well Facilities Contact Information For Additional Information, Please Contact: James Chris Cox Assistant Professor Texas Tech University Department of Petroleum Engineering P. O. Box 43111 Lubbock, Texas 79409-3111 Phone: (806) 742-3573 Fax: (806) 742-3502 Email: chris.cox@coe.ttu.edu

More Related