Construction Activities: Lindbergh: Continued to pour sidewalks and driveways.

Engineering & Construction Management Department. February Report, 2011. Upper Valley drainage Improvements PH IV.

alvaro
Télécharger la présentation

Construction Activities: Lindbergh: Continued to pour sidewalks and driveways.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department February Report, 2011 Upper Valley drainage Improvements PH IV General Project Description: Street and drainage improvements on Lindbergh from Montoya Rd. to Carl Ann Dr., to include new curb, sidewalks, ADA ramps and asphalt paving; Equestre from Redd to Mulberry, to include new curb, sidewalk, ADA ramps, asphalt paving, replacement of existing water and sanitary sewer lines. Construction Activities: • Lindbergh: • Continued to pour sidewalks and driveways. • Finished water main installation at Lindbergh and Montoya Rd. • Replaced irrigation crossing structure at Montoya Lateral Branch “A” and install headwalls. • Finished water main adjustment at Montoya Main Lateral, stared installation of cast in place junction box for irrigation. • Started compaction of base course from Montoya Main Lateral to Warriors. • Equestre: • Finished pouring sidewalk and driveways from Mulberry to Redd and finished paving. • Started cleaning roadway. Aerial Asphalt Paving on Equestre Project Schedule Page 1 of 2

  2. Engineering & Construction Management Department February Report, 2011 Upper Valley drainage Improvements PH IV • General Project Description: Street and drainage improvements on Lindbergh from Montoya Rd. to Carl Ann Dr., to include new curb, sidewalks, ADA ramps and asphalt paving; Equestre from Redd to Mulberry, to include new curb, sidewalk, ADA ramps, asphalt paving, replacement of existing water and sanitary sewer lines. Project Budget: $4,020,104.70 Notes: Funding Source: 2006 Storm CO’s Project Contact Project Manager Julian Rodriguez 915-541-4661 Design Consultant AIA Construction Contractor JAR Concrete Page 2 of 2