An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contract B Construction Activities 10.22.2009 5.20.2010 Norbeck Road Bridge

  2. Contract B Construction Activities N 5.20.2010 10.22.2009 Longmead Crossing Drive Bridge

  3. 7.9.2010 Longmead Crossing Drive Bridge

  4. Contract B Construction Activities 10.22.2009 5.20.2010 Layhill Road Bridge

  5. Contract B Construction Activities 7.9.2010 Layhill Road Bridge

  6. Contract B Construction Activities Pre-construction rendering 10.22.2009 5.20.2010 Northwest Branch Bridge west of Layhill Road

  7. 7.9.2010 Northwest Branch Bridge west of Layhill Road

  8. Contract B Construction Activities 10.22.2009 5.20.2010 7.9.2010 Bridge over Northwest Branch and Bonifant Road

  9. Contract B Construction Activities 10.22.2009 5.20.2010 New Hampshire Avenue Bridge

  10. Contract B Construction Activities 7.9.2010 New Hampshire Avenue Bridge

  11. Contract B Work As of June 2010 • Precast items: • Sound Barrier 761,700 SF 6% complete • Pipe 48" or smaller 55,000 LF 30% complete • Manholes and Inlets 500 Ea 24% complete • MSE Walls 64,000 SF 44% complete • 344 Girders 48,000 LF 43% complete Cast-in-place items: • Sound Barrier Footings 125,000 LF 13% complete • Bridge Decks 650,000 SF 11% complete • Parapets 22,000 LF 0% complete • Special Piers 62 Ea 58% complete • Total Concrete Placed 70,000 CY 32% complete Steel Girders: • 53 Girders 23,500 LF 19% complete (12,000,000 LBS) Paving items: • Hot Mix Asphalt (HMA) 460,000 TN 0% complete

  12. Contract C: US 29 to I-95 Contract C Completion 100% 68.9% - $ 68.3% - Time $513.9M Contract Amount

  13. Contract C Construction Activities 5.21.2009 5.20.2010 Old Columbia Pike Bridge

  14. Contract C Construction Activities 7.9.2010 5.20.2010 Old Columbia Pike Bridge

  15. Contract C Construction Activities Pre-construction rendering Aerial views of ICC construction at US 29 5.20.2010 10.22.2009 US 29 Interchange