1 / 1

Current Status of ewk MC Production

Current Status of ewk MC Production. All the 4.9.1 requests have been finished since January: PYTHIA, for tracking material studies. wewk[3-a]e zewk2m zewk[7-9]e MCFM or MC@NLO HEPG-interfaced, for WW trilinear gauge boson coupling studies. dewk[0-d]w

amena
Télécharger la présentation

Current Status of ewk MC Production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Status of ewk MC Production • All the 4.9.1 requests have been finished since January: • PYTHIA, for tracking material studies. • wewk[3-a]e • zewk2m • zewk[7-9]e • MCFM or MC@NLO HEPG-interfaced, for WW trilinear gauge boson coupling studies. • dewk[0-d]w • Planning to work with Alan Sill et al on 5.3.1 ewk MC activities using farms this summer… to be discussed. Simulation Mtg, April 22 2004

More Related