1 / 14

Utah Geothermal Developments 2005

Utah Geothermal Developments 2005. Utah Geothermal Resources Project Activity Utah Geothermal Working Group Geothermal Web Site. Geothermal Resources in Utah. Most higher temperature resources in Basin & Range and Transition Zone Tectonically active (Quaternary faults)

amos-noel
Télécharger la présentation

Utah Geothermal Developments 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Utah Geothermal Developments2005 • Utah Geothermal Resources • Project Activity • Utah Geothermal Working Group • Geothermal Web Site

  2. GeothermalResourcesin Utah • Most higher temperature resources in Basin & Range and Transition Zone • Tectonically active (Quaternary faults) • Young igneous rocks (active volcanism) • High Heat Flow

  3. Geothermal Use in Utah

  4. Newcastle Geothermal Area • Southeast edge of Escalante Valley, Iron Co. • Four Commercial Greenhouses • Potted plants, cut flowers, tomatoes • Two Operators – Milgro Newcastle and Castle Valley GH • ~ 25 Acres under cover • 6 – 7 production wells, ~ 500 – 600 ft deep, ~ 180 – 200°F • Fluid disposal in 4 percolation ponds and 3 injection wells

  5. Milgro Newcastle, Inc. • Largest producer of chrysanthemums • One of nation’s largest producers of Dutch bulb crops – irises, tulips, daffodils, hyacinths, and potted calla lilies • Currently produces 13 million potted plants and cut flowers annually • Recently acquired Royal Van Zanten, a leading producer of cuttings, and now ships 30 million cuttings a year to other growers

  6. Roosevelt Hot Springs KGRA • The Pacificorp Blundell plant was dedicated in 1984 and has improved plant efficiency, but no expansion since then (26 MW gross) • Pacificorp (Utah Power) owns/operates Blundell plant • Intermountain Geothermal Co. operates well field • Purchase of Pacificorp was announced on May 24 by MidAmerican Energy Holdings Co. (~ $9.4 billion)

  7. Pacificorp Purchase Effect on Blundell? • Intermountain Geothermal Company (field operator) • IGC is a component of California Energy Company, • CEC is a subsidiary of MidAmerican Energy Holdings Co. (80% owned by Berkshire Hathaway Inc.) • Plant operation and field development combined • Estimates of 50 to 100 MW sustainable output from RHS

  8. Bonnett Geothermal Power PlantCove Fort – Sulphurdale KGRA • Plant and field purchased in 2004 by Recurrent/AMP Resources from UMPA/Provo City • Preliminary plans include reconstruction of power station by a 30 – 40 MW Kalina cycle plant (ammonia and water) • Development waiting on power purchase agreement and pending offering of federal leases on national forest land • Operation suspended

  9. Crystal Hot Springs - Bluffdale • Point-of-the-Mountain at Bluffdale, Salt Lake County; Flowing thermal springs fill several ponds, surface temp of ~ 135°F, subsurface temp ~ 195°F • Current Users - • Bluffdale Flowers greenhouses (250,000 ft2, roses) • Formerly Utah Roses, began in early 1980s; plans to expand to 500,000 ft2 (11 ½ ac.) • Oquirrh 4 minimum security dormitory at State Prison • Hi-Tech Fisheries (tropical fish, Lake Malawi, GRV Africa)

  10. Space & Water Heating at Utah State Prison • In 2003, UDOC contracted Johnson Controls (ESCO) for improved management of energy, water, and waste (performance based) • Included re-establishing geothermal heating system for Oquirrh 4 facility • GT heating system in 1983-85 failed due to scale and corrosion • Oquirrh 4 complex Phase I: ~ 39,000 ft2 space and water heating • $519,000 investment for annual savings of $69,000; • payback – 7.6 years, predicted life – 17 years. • Oquirrh 4 complex Phase II (2006?): ~ 250,000 ft2 of building area • $1,524,000 investment for annual savings of $123,800 • 12 ½ year payback

  11. Utah Geothermal Working Group • Promote innovative development and effective use of Utah’s geothermal resources for direct use and power generation • Primary Emphasis - promote direct-use applications and small-scale geothermal power projects to stimulate rural economic development opportunities • Objectives (1) inform and educate members about geothermal resources and development in Utah, and (2) help remove barriers to geothermal development

  12. Utah Geothermal Working Group • First meeting – March 4, ‘03 • Latest meeting Feb 24, ’05 • Next meeting Oct 12, ‘05 • ~ 30 - 40 people from federal & state gov’t, academia, and private sector • UGWG Position Paper on Geothermal Energy Development in Utah • Brief summary of benefits, impediments, and policy options for future growth

  13. http://geology.utah.gov/

  14. http://geology.utah.gov/emp/geothermal/index.htm

More Related