An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pilot PlantSummary of work Runólfur Maack VGK Engineering

  2. Project meeting, June 24-27, 2001 • First discussions on pilot plant • Pilot plant concept and purpose • Conclusive on a simple pipe solution or concept • …… or the KISS principle

  3. Argumentation • High level of uncertainty of fluid characteristics • To get the feeling for the fluid in as quick or cheap manner as possible • To minimize the risk for damaging the well • Fluid sampling and analysis • The development of the pilot plant will be stepwise

  4. Phase 1 – Identification of the geothermal fluid Litterature study Theoretical analysis Sampling and analysis Recommendations for phase 2 Phase 2 – Utilization of the geothermal fluid Tests Energy process planning Chemical process planning Well completion Stepwise development

  5. Purpose • Obtain first fluid samples • Indication of pressure, temperature, enthalpy • Propose how to deal with the fluid • Processes • Chemicals • Methodology to determine viability of IDDP • Side effects • Reinjection well • Deep well production zone

  6. Processes • Potential energy processes • Thermal • Electrical • Potential chemical processes • Gas • Solids • Liquid

  7. Pilot plant group • Albert Albertsson, HS, Deep Vision • Runólfur Maack, VGK, SAGA • Jón Örn Bjarnason, ROS, SAGA • Kristinn Ingason, VGK • Claus Ballzus, VGK • Teitur Gunnarsson, VGK

  8. Well simulationJón Örn Bjarnason • Well simulation • Fluid flow analysis • Enthalpy, analysis • Temperature and pressure • .........

  9. Electrical generationKristinn Ingason • Electrical processes • Direct • Indirect • Binary • The aim is to find out what additional pros and cons there are in the IDDP from conventional systems • ............

  10. Chemical processesTeitur Gunnarsson • Chemical processes • Sulphur production? • CO2 production? • Methane gas • Hydrogen • Materials (gold?) • .............

  11. Mechanical designClaus Ballzus • Pilot plant design • Conceptual design • Pipe diameter • Material selection • Pipe installation • ............... • Wellhead design

  12. Present status • The progress so far according to plans • Still in the early phases • The present workshop is to finalize the strategy how to complete