SlideServe
Menu
Préférences
© SlideServe · v2026

Performance Work Group Report/Update

anoush avatar
10 diapositives · 274 Views · Jul 27, 2014

Performance Work Group Report/Update. Raymond R. Vojdani, P.E. Western Area Power Administration. Performance Work Group Report. Project 068 Update Calculation of PII in WIT Session of Manual Time Error Correction AIE Survey In WIT SAR For Use of WIT’s Calculated PII .

Performance Work Group Report/Update - slide 1
01 / 10Performance Work Group Report/Update
1 / 17

Télécharger la présentation

Performance Work Group Report/Update
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Performance Work Group Report/Update Raymond R. Vojdani, P.E. Western Area Power Administration

  2. Performance Work Group Report • Project 068 Update • Calculation of PII in WIT • Session of Manual Time Error Correction • AIE Survey In WIT • SAR For Use of WIT’s Calculated PII

  3. Project WECC-0068 Update • Project WECC-0068 Update • FERC approved BAL-004-WECC-1 with conditions (Order 723) • PWG also wanted to make some changes to clarify Control ACE V.S. Reporting ACE • In addition, some clean up changes like polarity in ACE formula for IME

  4. Project WECC-0068 Update • FERC Issues: • Address R1: Large Accumulation • Address R2: No. of hours not in ATEC Mode (24 hrs) • Address use of ACE for control and reporting (NERC requires to use ACE as defined in BAL-001 for reporting, while, BAL-004-WECC-1 requires ATEC ACE for control) • Address VSL (too low)

  5. Project WECC-0068 Update • PWG Issues • Clean up sign discrepancy in NERC ACE and ATEC ACE for IME • Ungroup the ATEC term from the NSI and abandon use of NSI’ • Some other minor cleanups

  6. Project WECC-0068 Update • First draft of revised standard was posted on April 15th for 45 days of commenting period • 2nd Draft was posted on August 15th for 45 Days of Comment Period. • If all goes well, the WECC BOT will sign the new Standard by Jan. 1, 2012 • Along with new BAL-004-WECC-2, there will also be a new Standard (BAL-001-0.1A ) to replace NERC’s BAL-001 as a Variance for WECC BAs. • This is mostly to have ATEC term in the ACE formula

  7. WIT & PII Update • Calculation of PII in WIT has been running for several months • PWG members and WECC staff have been testing, verifying, and trouble shooting PII calculation • Accumulated On-Peak Primary Inadvertent and Accumulated Off-Peak Primary Inadvertent Have Been Verified For All Balancing Authorities Through April 2011.

  8. WIT & PII Update • All BAs Are Encouraged to Use WIT’s Calculated PII • Using EIDE Protocol, BAs Can Obtain PII Values and Recommended Payback (to incorporate in their AGC) from WIT • There Is An Effort to Make These Data Available to BAs via ICCP

  9. Other Issues • Session of Manual Time Error Control • NERC is working on a field trail to stop manual time error correction • It was expected to go into effect by Oct. 2011, but, due to issues raised by WECC it is postponed until 2012 • AIE Survey In WIT • WECC, NERC, OATI & EPG (Electric Power Group) Are Working to address data transfer from WIT to CERT • SAR for Using WIT as Primary Source for PII Calculation and Accounting

  10. WIT & PII Update Questions?