Injection Team Report: Successful Beam Transfer and Emittance Conservation
The injection team, led by B. Goddard, reports successful full intensity batches injected with no issues observed. The results are comparable to Q26 in terms of injection losses, trajectories, and emittance preservation. Upgrades have been made to the extraction settings in SPS, and longer bunch lengths (1.65 ns) have proven acceptable with manageable losses. The system is nearly ready for deployment, pending minor checks. TI8 dispersion measurements indicate injection losses at approximately 10% of dump level, with emittances conserved at injection.
Injection Team Report: Successful Beam Transfer and Emittance Conservation
E N D
Presentation Transcript
Q20 MD results B.Goddard for injection team and colleagues
Q20 extraction, transfer and injection MD • Full intensity batches injected – physics filling scheme • No issues seen – comparable to Q26 for injection losses, trajectories, protection, emittance preservation, capture • Some tidying up done of extraction settings in SPS • Longer bunch length (1.65 ns) preferred (losses OK) • Basically ready for deployment from beam transfer side (some small checks needed)
Injected emittances • Emittances conserved at injection (matching good!) B2H B1H B1V B2V