1 / 4

First results of the SPS MD in W39 with 25 ns beam in Q20 optics

First results of the SPS MD in W39 with 25 ns beam in Q20 optics. J. Esteban Müller , T. Bohl , C. Lazaridis , E . Shaposhnikova. LIU-SPS BD WG 27/09/2012. Conditions for 25 ns. N b ~ 1.1 x 10 11 ppb 200 MHz voltage: 4.5 MV at FB 800 MHz voltage: 10% of the 200 MHz

jed
Télécharger la présentation

First results of the SPS MD in W39 with 25 ns beam in Q20 optics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First results of the SPS MD in W39 with 25 ns beam in Q20 optics J. Esteban Müller, T. Bohl, C. Lazaridis, E. Shaposhnikova LIU-SPS BD WG 27/09/2012

  2. Conditions for 25 ns • Nb~ 1.1 x 1011 ppb • 200 MHz voltage: 4.5 MV at FB • 800 MHz voltage: 10% of the 200 MHz • Longitudinal damper settings copied from the 50 ns operational beam • This needs to be checked • Blow-up: • Amplitude was changed in order to find good settings • Low frequency margin set to 0.85 (instead of 0.8) LIU-SPS BD WG 27/09/2012

  3. 25 ns Q20 • Unstable at FT without blow-up • Stable with blow-up, but the effect is stronger for bunches in the head and the tail of the batch • Blow-up needs to be optimized for this beam Blow-up OFF Blow-up ON LIU-SPS BD WG 27/09/2012

  4. 50 ns Q20 for LHC filling • Nb ~ 1.55 x 1011 ppb • 200 MHz voltage: 4.5 MV at FB • 800 MHz ON Blow-up OFF Blow-up ON Few bunches unstable at FT Stable LIU-SPS BD WG 27/09/2012

More Related