Jean-Claude BRIENT LLR – Ecole Polytechnique

CALICE status and Plans. Jean-Claude BRIENT LLR – Ecole Polytechnique. Approved PRC-DESY n°02-01 Presented at PAC-FNAL. collaboration CALICE. http://polywww.in2p3.fr/flc/calice.html. ~200 phys./engineers 38 +1 laboratories 11 countries +1 !! 3 regions.

archer
Télécharger la présentation

Jean-Claude BRIENT LLR – Ecole Polytechnique

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CALICE status and Plans Jean-Claude BRIENT LLR – Ecole Polytechnique J.-C. Brient (LLR)

  2. Approved PRC-DESY n°02-01 Presented at PAC-FNAL collaboration CALICE http://polywww.in2p3.fr/flc/calice.html ~200 phys./engineers 38+1 laboratories 11 countries +1 !! 3 regions CIEMAT Madrid is in discussion for joining (meeting 25/26 September at LAL-Orsay) J.-C. Brient (LLR)

  3. Who and Where BelarusMinsk Univ. Canada McGill Univ. , Univ. Of Regina Czech RepUniv. Charles-Prague, IOP-ASCR FranceLAL-Orsay, LAPP-Annecy,LPSC-Grenoble, LLR- Ecole Poly. , LPC-Clermont , IPNL-Lyon GermanyDESY , Univ. Hambourg India BARC-Mumbai JapanKOBE Univ., SHINSHU Univ. Korea Kangnung NU. , Seoul NU., Ewha Univ., Sungkyunkwan U., Yonsei U. Russia ITEP, IHEP-Protvino, LPI, Moscow SU , MEPHI Spain CIEMAT-Madrid in discussion UKBirmingham, Cambridge, Imperial CL, Manchester, University CL, Royal Holloway UL, Rutherford AL USA Argonne NL, Boston , Univ. Chicago, Texas Univ.Arlington, North Illinois Univ., Univ. Iowa St, Close contact with Fermilab + contacts with labsChina (Tsinghua) Brazil (San Paulo) CERN , Italy (Pavia, Pisa) , ETC… Labos ECAL Labos HCAL J.-C. Brient (LLR)

  4. The proposed solutions ECAL : Sampling calorimeter Solution 1 : tungsten(density) - silicon(pixel size ~ Molière radius) Solution 2 : tungsten -MPPC and scintillator tile/strip Pixels size <1cm² and about 20-30 readout layers (15 to 250 Millions channels) HCAL Solution 1 : Sampling calorimetertungsten/Stainless steel(density) –digital readout (pixel size) Solution 2 : Sampling calorimetertungsten/Stainless steel(density) – scintillator tile (small size) Pixel size 1cm² and about 50 readout layers (~50 Millions channels) Pixels size 16cm² and about 50 readout layers readout by silicon PM !! J.-C. Brient (LLR)

  5. Our plans A first generation prototypes, which allows to debug the concept and technologies 2001 - 2005 A second generation prototypes, much closer to the final detector 2006 - 2009 Ready for LOI, Proposal etc… in 2010 !! J.-C. Brient (LLR)

  6. First generation prototypes • ECAL ready and in use at test beam • Tile HCAL using SiPM from Russia ready and in use at test beam • Digital HCAL in plan ( waiting for funding !!!) J.-C. Brient (LLR)

  7. DETECTORS MATRIX ECAL Czech Russia Korea AND • Brazil (Unicamp-Sao Paulo) • BARC - India Hamamatsu not in the list !! (already some contact , but only with Hamamatsu-France) J.-C. Brient (LLR)

  8. ECAL Test beam status TCMT HCAL J.-C. Brient (LLR)

  9. Cells in red : Signal > 20% of Mip Cells in red : Signal >50%of Mip J.-C. Brient (LLR)

  10. Events at 20 degres preliminary Angular resolution mrad Beam enery GeV J.-C. Brient (LLR)

  11. June 2006 , Installation at CERN H6 test beam area J.-C. Brient (LLR)

  12. CERN Summer 06 Tail Catcher (scint.strip-SiPM) Tile HCAL (scint. Tiles–SiPM) ECAL (W-Si) J.-C. Brient (LLR)

  13. J.-C. Brient (LLR)

  14. J.-C. Brient (LLR)

  15. J.-C. Brient (LLR)

  16. Statistics of the CERN test beam J.-C. Brient (LLR)

  17. J.-C. Brient (LLR)

  18. Next steps • Test with electron (may be small energy hadron) • test of running with the VFE chip INSIDE the detector • Test beam with AHCAL+ECAL for debugging • and … single layer test (new design) … • Test with Hadron CERN ?? Summer 2007 MTBF Fall 2007 • Use EUDET funding for the construction of ½ ECAL module • with all news developments + Possible Digital HCAL module 2008 – 2010 Second generation prototypes in test beam FNAL ? may be the right time for an alternative ECAL with MPPC and scintillator strips ? J.-C. Brient (LLR)

  19. Second generation prototypes • Tile HCAL , ECAL in design , R&D in progress • Digital HCAL in plan ( waiting for funding !!!) (LAL, LLR, LAPP, IPNL, IHEP-Protvino, and CIEMAT ??) J.-C. Brient (LLR)

  20. Second generation ECAL prototype Concept : to be the most representative of the final detector module : • A alveolar composite/tungsten structure with : - same W sampling - 3 columns of cells to have representative cells in the middle of the structure (with thin composite sheets ) - Identical global dimensions (1.5m long) and shape (trapezoidal) - fastening system ECAL/HCAL (include in the design of composite structure) • 15 Detector slabs with FE chips integrated - 1 long and complete slab (L=1.5m) - 14 short slabs to obtain a complete tower of detection (typ. L=30 cm?) and design of compact outlet. Fastening system Alveolar Structure C/W 3×15 cells Short detector slabs (14) Long detector slab (1) Complete Tower

  21. Example of R&D NEW DESIGN for the ECAL Detector Slab • Better for mechanical behavior • Better Molière radius • Better for indust. assembling • DAQ based on FPGA • better for VFE • etc… Tested at industrial level J.-C. Brient (LLR)

  22. Example of R&D Slab FE FPGA Conf/ Clock Clock+Config+Control VFE ASIC VFE ASIC VFE ASIC VFE ASIC PHY Data ECAL, AHCAL, DHCAL A common approach detector readout BOOT CONFIG FE-FPGA Data Format Zero Suppress Protocol/SerDes FPGA Config/Clock Extract Clk Clock VFE ASIC Bunch/Train Timing Config Data 1G/100Mb Ethernet PHY ADC Data J.-C. Brient (LLR)

  23. Tail Catcher HCAL Electronics Racks ECAL Beam Possible setup at FNAL MTBF J.-C. Brient (LLR)

  24. Conclusion • Due to the lack of funding and Manpower , sharing is a necessity and therefore CALICE is just MANDATORY !! • It is a NO-LOOSER collaboration (at the time of decision, everybody will be already in the good boat) • the progress is important (test beam) and the road map is well established Negative point • LARGE labs are still missing in the collaboration (CERN, FNAL, KEK , LBL ) J.-C. Brient (LLR)

  25. A major lab is mandatory to organise and manage the work on the silicon wafers for the ECAl W-Si > Discuss with large producers like Hamamatsu !! > Define the protocol of the data quality control (existing expertise and engineering structure and people) > Manage the sharing between smaller labs > … J.-C. Brient (LLR)