1 / 12

By Dave Iwamoto

Review of Shipbuilding Quality and Current Technical Challenges. By Dave Iwamoto. What is Quality?. “Workmanship”. Quality. “Engineering & Designing”. “Total power in meeting contractual commitments”. Workmanship. Continuously maintained Both.... own and outsourced labour

Télécharger la présentation

By Dave Iwamoto

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Review of Shipbuilding Quality and Current Technical Challenges By Dave Iwamoto Tripartite Meeting 2010, Tokyo

  2. What is Quality? “Workmanship” Quality “Engineering & Designing” “Total power in meeting contractual commitments” Tripartite Meeting 2010, Tokyo

  3. Workmanship • Continuously maintained • Both.... own and outsourced labour • What is the balance -? • Skill transfer • Transfer unsteady •  Training required to fill gap • Mind training •  Responding naturally to disorders • .... Narrow miss experience • Coordination with design instructions • Design workmanship quality Tripartite Meeting 2010, Tokyo

  4. Share between own labour and outsourced labour Source: The Shipbuilders’ Association of Japan (SAJ) Tripartite Meeting 2010, Tokyo

  5. Workmanship • Continuously maintained • Both.... own and outsourced labour • What is the balance -? • Skill transfer • Transfer unsteady •  Training required to fill gap • Mind training •  Responding naturally to disorders • .... Narrow miss experience • Coordination with design instructions • Design workmanship quality Tripartite Meeting 2010, Tokyo

  6. Design Workmanship • Needed for seeking benefits of efficient repeat work •  More details covered by design • Dependence on design workmanship information •  Lose flexibility in making judgment on site • Design workload is overloaded •  Less experienced designers engaged •  IT/mechanized process?  coverage and cost Tripartite Meeting 2010, Tokyo

  7. Engineering & Designing • Rule complying skills • > Complying in a smarter way -- competing element • > Less prescriptive rule making -- more thinking • Customer satisfaction is the key • > Rules needing studies -- beyond capacity of yard? • Co-work among stakeholders including resources for studying (Tripartite framework helps) • > Importance of intellectual property rights • Incentive to continue study (security and reward) • Innovative technology Tripartite Meeting 2010, Tokyo

  8. How Can We Measure Quality? Deficiencies by main categories in 2009 (total: 86,820) Others 35% (29,967) Life saving appliances 14% (12,131) Fire safety measures 17% (14,619) ISM related 4% (3,386) Safety of navigation 16% (14,207) Stability, structure and relevant equipment 7% (6,462) Load lines 7% (6,048) Share of “Stability, structure and relevant equipment”, the most shipbuilding-related category is small (7%) and has been declining since 2000 (13%). Source: Tokyo MOU Annual Report 2009 Tripartite Meeting 2010, Tokyo

  9. Engineering and Designing • Rule complying skills • > Complying in a smarter way -- competing element • > Less prescriptive rule making -- more thinking • > Rules needing studies -- beyond capacity of yard? • > Importance of intellectual property rights • Innovative technology • > Courage to make attempts -- be consistent • > Skill Transfer -- person dependent to company effort •  Project planning to ensue continuity • > Watch site engineering too! •  Important for quality as a whole Tripartite Meeting 2010, Tokyo

  10. Capacity to Meet Contractual Commitments • If neither party foresees problems • – good practice may help • If it is a foreseen problem • – closer working relations may help • Practices are based on culture • – requires time to change Mutual trust and understanding to establish contract terms.... How frank can we discuss? Tripartite Meeting 2010, Tokyo

  11. Summary • Careful management of workmanship of workers and designers  Ensure long term continuity • Skill transfer framework - human element dependent and IT support have limits •  Building up of experience • Culture of good thinking needed for meeting rule requirements or innovative technology •  Compete well! • Get stakeholders together to cooperate •  Improve culture! and talk frankly • Respect Intellectual Property! • Keep your eye on the site Tripartite Meeting 2010, Tokyo

  12. Thank you for your attention! Dave Iwamoto, CESS Chairman Committee for Expertise of Shipbuilding Specifics Tripartite Meeting 2010, Tokyo

More Related