An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R. P. Gallagher Associates Structural Engineers PHS - MAINTENANCE BUILDING SEISMIC STRENGTHENING PROGRAM/ MEASURE E BOND PROGRAM INVESTIGATION, ANALYSIS, AND PRELIMINARY CONCEPT October 24, 2007

  2. PIEDMONT MIDDLE SCHOOL (E) TRAILER (E) STORAGE (E) TRAILER (E) TRANSFORMER (E) WORKSHOP SITE PLAN

  3. STRUCTURAL • STRUCTURES DO NOT MEET ASCE 31 • WOOD BUILDING AND TRAILERS WILL LIKELY FALL OFF SUPPORTS • PREFAB UNLIKELY TO COLLAPSE, BUT MAY BE DAMAGED • MEZZANINES DO NOT MEET CODE • MANY NONSTRUCTURAL HAZARDS • CONTINUED OPERATIONS SEVERELY IMPAIRED OR PREVENTED AFTER EARTHQUAKE • ESSENTIAL IN PREPAREDNESS AND RECOVERY OPERATION

  4. ADA / ACCESSIBILITY • PATH OF TRAVEL NON COMPLIANT • NO ACCESSIBLE ROUTE • LACK OF CODE COMPLIANT DIRECTIONAL SIGNAGE • STAIRS ARE NON COMPLIANT • NO RAMP FOR WHEELCHAIR ACCESS • NO ACCESSIBLE PARKING

  5. FIRE & LIFE SAFETY • EXTERIOR SIDES OF EXIT DOORS DO NOT HAVE HANDRAILS OR LANDINGS • LACK OF PROPER EXHAUST SYSTEMS • LACK OF OSHA COMPLIANCE • NO FIRE ALARM • UNSAFE STORAGE

  6. VARIOUS OPTIONS: • REPAIR EXISTING BUILDINGS • REMOVE WOOD FRAME BUILDINGS AND TRAILERS, REPLACE WITH NEW BUILDINGS • REPLACE ALL BUILDINGS

  7. 1. NEW WORKSHOP/ UPGRADED METAL BUILDING • PROJECT COST: $ 1 – 1.8 Million • OUTCOMES: • More functional • 5 Standard parking spaces • Meets ASCE 41 2,000 sf 2,000 sf EXISTING NEW

  8. 2. NEW WORKSHOP/ STORAGE/ OFFICES • PROJECT COST:$ 2.7 Million • OUTCOMES: • 4000 sf new building • Code compliant • 5 truck parking spaces plus 3 standard parking spaces • Efficient layout 4,000 sf EXISTING NEW

  9. R. P. Gallagher Associates Structural Engineers PHS – MAINTENANCE BUILDING PRISCILLA MECKLEY – ARCHULETA MIKE WASSERMANN JOHN NELSON RON GALLAGHER* For more information, visit http://www.pusdbond.org