1 / 11

Production Planning

Production Planning. Eric van Herwijnen Thursday, 20 june 2002. Contents. Current capacity & channel interest Additional capacity (Grid) Job organization Data Quality Checking Improvements to Production tools. Current MC capacity (estimate). Current MC capacity (estimate).

arnold
Télécharger la présentation

Production Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Planning Eric van Herwijnen Thursday, 20 june 2002

  2. Contents • Current capacity & channel interest • Additional capacity (Grid) • Job organization • Data Quality Checking • Improvements to Production tools

  3. Current MC capacity (estimate)

  4. Current MC capacity (estimate)

  5. Additional capacity (GRID) • Several centers (Nikhef, Cambridge) are making CPUs exclusively available through DataGrid • Status DataGrid?

  6. Organization • Most centers are operational now • Sw installed • Jobs submitted through web interface • Output and logs sent back to cern • Bookkeeping db updated • Install latest versions of Sicbmc and Brunel for test productions, tar files will be provided (next week) • Run prototype production (26/6 – 3/7)

  7. Job organization (prototype production) • Prototype production mainly done at CERN but will also be used to consolidate outside centers • Channel (or generic b/c) job will consist of: • Generation of 1 channel/generic b/c set of 1000 events • Reconstruction of 1 channel set • Channel DST sent back to CERN

  8. Job organization (prototype production) • Channel (or background) job will consist of: • Generation of 3 mbias sets of 500 events for spillover • Generation of 1 channel set of 1000 events • All RAWH sent back to CERN • Channel DST sent back to CERN

  9. Job organization (production) • Channel (or background or b/c inclusive) job will consist of: • Generation of 3 mbias sets of 500 events for spillover • Generation of 1 background/b/c incl set of 1000 events • Channel/background/b/c incl. DST sent back to CERN • Mbias DST (500 events) sent back to CERN

  10. Data Quality Check • Existing program works with Zebra • Needs to be converted to OODST, merged with current histograms in Brunel • Centers will be responsible for checking: • Size of output datasets • Correct filetransfer to CERN • Correct updating of bookkeeping db

  11. Improvements to production tools • Suggestion for removing site dependencies from Java code to local scripts from Andrei • Prototype installed in Lyon, will be tested in production • Also installed at CERN, to be tested with new production/configuration/bookkeeping db and tools

More Related