1 / 27

Leah Johanson, Water Environment Services Andy Thayumanavan, Brown and Caldwell

LID & Detention Pond Sizing Tool to Address Hydro-modification and Water Quality in Clackamas County . Leah Johanson, Water Environment Services Andy Thayumanavan, Brown and Caldwell Janice Keeley, Brown and Caldwell. Agenda. Background Hydro-modification Tool Criteria Development

ash
Télécharger la présentation

Leah Johanson, Water Environment Services Andy Thayumanavan, Brown and Caldwell

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LID & Detention PondSizing Tool to Address Hydro-modification and Water Quality in Clackamas County Leah Johanson, Water Environment Services Andy Thayumanavan, Brown and Caldwell Janice Keeley, Brown and Caldwell

  2. Agenda • Background • Hydro-modification • Tool Criteria Development • Low Impact Development (LID) Sizing Tool • Detention Pond Sizing Tool • User Interface • Next Steps • Questions

  3. WES Surface Water Program Evolution • Past emphasis on meeting regulatory requirements • Stormwater management at the “site level” • Movement toward goal of improving overall health of the watershed • WES can best achieve this through effective and efficient stormwater management • Partnering with others on non-stormwater-related activities that will help WES meet this goal

  4. Watershed Action Plans Project Purpose • To develop basin specific plans that prioritize District activities and future investments for watershed management

  5. Watershed Action Plans Study Area

  6. Key Outcomes of WAP • Better understanding of the conditions in the watersheds • Identification of high priority areas • Prioritized CIP/ programmatic changes • Early action items • Update Stormwater Design Standards

  7. Purpose of Sizing Tool • Stormwater design standards updated to promote the use of Low Impact Development (LID) techniques, to promote infiltration and reduce hydro-modification impacts to streams • Develop a simplified tool for development engineers to easily size LID and Detention BMPs to implement the new design standards

  8. What is Hydro-modification? The frequency and duration of geomorphically significant flows are the primary factors that control channel stability or instability • Geomorphically significant flows range between: • Lower Threshold – bed material is mobilized • Upper Threshold – channel bank over-topping event

  9. Hydromodification Criteria Development • Lower Flow Threshold – 0.42Q2 (ODOT) • Upper Flow Threshold – Q10 (ODOT) • HSPF Modeling Parameters (2006 SWMP MP, PWR) • Rainfall Record

  10. Sizing Strategy – Flow Duration Upper Threshold Flow Lower Threshold Flow

  11. Sizing Strategy – Peak Flow Upper Threshold Flow Lower Threshold Flow

  12. Sizing ToolComputational Methods: Site Hydrology • Developer Enters: • Site specific infiltration rate • Planned impervious area • Pre-developed land use • Drainage area hydrologic soil group – B, C, D

  13. LID Sizing Tool • Facility Types (7 options) • Planter (Infil & Fil) • Rain Garden (Infil & Fil) • Vegetated Swale (Infil & Fil) • Infiltrator

  14. LID Sizing ToolComputational Methods: Facility Geometry • Rain Garden Example

  15. Sizing Tool Results • Finished Product – Web-based interface with underlying look-up table containing sizes for each possible iteration of drainage area land use, soil type, facility type and site specific infiltration rate

  16. Detention Pond Sizing Approach • The detention pond sizing tool performs the following functions • Configure pond geometry • Design outlet structure • Route post-project runoff • Compare pre-project and mitigated flow duration • Size the facility automatically to meet the WES HMP requirements

  17. Computational Methods: Pond Geometry • User inputs initial pond configuration including area, depth and side slopes • Alternatively, the tool automatically provides initial pond geometry

  18. Detention Pond Interface

  19. Stage-Storage-Discharge Table

  20. Flow Duration Analysis • Flow duration comparison is performed for pre- and mitigated time series hydrograph • Complete time series is analyzed • Range of interest is between lower and upper threshold flows

  21. Resizing the Pond • If flow duration criteria is not met then the pond is resized iteratively • The user can use the option to resize by either adjusting the area or depth • Pond sizing is completed when hydro-modification performance requirements are met

  22. Next Steps • Beta testing • Meetingswith co-permittees • Testing and training • ODEQ 319 Grant Funding • Web-based tool rolled out with new design standards • Continued monitoring and adaptive management

  23. Questions?

  24. Sensitivity Analysis • Slope • Thresholds • Time steps

  25. Computational Methods: Outlet Structure • Use pre-defined outlet configuration that include two orifices and an overflow weir. • The bottom orifice is sized to discharge lower threshold flow, QLT • The orifice is sized to discharge the upper threshold flow, QUT.

  26. Compare Histograms • Direct comparison between pre- and post-project durations for each flow bin is performed. • A “Pass” or “Fail” result is generated for each flow bin within the lower and upper threshold flows. • Results take into account the allowable 10% variance over the length of the curve (0.42Q2 to Q10).

  27. Flow Duration Comparison

More Related