40 likes | 138 Vues
This report details data timeliness, processing completeness, market delivery, and anomalies observed in July 2014. It also includes SMT API and FTPS services availability, along with account statistics by type.
E N D
SMT Update To AMWG Monthly Report for July 2014
Monthly SMT Data Timeliness AMWG CR 2014 002End to End File Processing Completeness – July 2014 Monthly Attainment - Files to FTPS: 97.07% Files to Portal: 99.29% TARGET (95%) % Timely Market Delivery - % of files posted to market (FTPS) by 11:00pm out of # of files received by SMT by 11:00pm. % Portal Data Availability - % of files loaded to the database for data availability on portal by 6:00am next day for the files received by 11:00pm * A LSE file includes usage data for upto 50,000 ESIIDs. The master files are also considered for above metrics. Observed Anomalies: • 07/07 to 07/21 - Observed delays in posting files to FTPS due to an issue with file encryption due to introduction of enrollment. Corrected the problem to avoid delays. • 07/28 - Observed temporary issue with database which was corrected immediately 2
SMT API and FTPS Services Availability The service availability is measured as a percentage of number of minutes the service was available out of the total number of minutes in a month excluding planned outages. • We have intermittent issues from 07/13 to 07/21 due to high volume Ad hoc API requests and integration issue between SMT & TDSP systems