Project and Production Management

module 8: Production Planning Back to main index exit continue. Project and Production Management. Module 8 Production Planning over the Short Term Horizon. Prof Arun Kanda & Prof S.G. Deshmukh , Department of Mechanical Engineering, Indian Institute of Technology, Delhi.

austin
Télécharger la présentation

Project and Production Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. module 8: Production Planning Back to main index exitcontinue Project and Production Management Module 8 Production Planning over the Short Term Horizon Prof Arun Kanda & Prof S.G. Deshmukh, Department of Mechanical Engineering, Indian Institute of Technology, Delhi

  2. module 8: Production Planning MODULE 8: Production Planning over the Short Term Horizon 1. Forecasting 2. The Analysis of Time Series 3. Aggregate Production Planning: Basic Concepts 4. Aggregate Production Planning: Modelling approaches 5. Illustrative Examples 6. Self Evaluation Quiz 7. Problems for Practice 8. Further exploration Back to main index exit

  3. module 8: Production Planning Back to main index exitback to module contents 1.Forecasting

  4. module 8: Production Planning Back to main index exitback to module contents FORECASTING Forecasting is essential for a number of planning decisions LONG TERM DECISIONS • New Product Introduction • Plant Expansion

  5. module 8: Production Planning Back to main index exitback to module contents MEDIUM TERM DECISIONS • Aggregate Production Planning • Manpower Planning • Inventory Policy SHORT TERM DECISIONS • Production planning • Scheduling of job orders

  6. module 8: Production Planning Back to main index exitback to module contents System Objectives PLANNING PROCESS A Forecast of Demand is an essential Input for Planning Plan of Action Demand Forecast System to be Managed • Constraints • - Budget / Space • Resources • - Men • - Equipment

  7. module 8: Production Planning Back to main index exitback to module contents METHODS OF FORECASTING (a) Subjective or intuitive methods • Opinion polls, interviews • DELPHI (b) Methods based on averaging of past data • Moving averages • Exponential Smoothing

  8. module 8: Production Planning Back to main index exitback to module contents (c) Regression models on historical data • Trend extrapolation (d) Causal or econometric models (e) Time - series analysis using stochastic models • Box Jenkins model

  9. module 8: Production Planning Back to main index exitback to module contents module 8: Production Planning Back to main index exitback to module contents FORECASTING • Objective • Scientific • Free from ‘BIAS’ • Reproducible • Error Analysis Possible PREDICTION • Subjective • Intuitive • Individual BIAS • Non - Reproducible • Error Analysis Limited

  10. module 8: Production Planning Back to main index exitback to module contents COMMONLY OBSERVED “NORMAL” DEMAND PATTERNS Constant Linear Trend D D t t

  11. module 8: Production Planning Back to main index exitback to module contents D D Seasonal Pattern with Growth Cyclic t t

  12. Transient Impulse module 8: Production Planning Back to main index exitback to module contents ABNORMAL DEMAND PATTERNS Sudden Fall Sudden Rise

  13. module 8: Production Planning Back to main index exitback to module contents OPINION POLLS • Personal interviews e.g. aggregation of opinion of sales representatives to obtain sales forecast of a region • Knowledge base (experience) • Subjective bias • Questionnaire method • questionnaire design • choice of respondents • obtaining respondents • analysis and presentation of results (forecasting) • Telephonic conversation • Fast • DELPHI

  14. module 8: Production Planning Back to main index exitback to module contents DELPHI A structured method of obtaining responses from experts. • Utilizes the vast knowledge base of experts • Eliminates subjective bias and ‘influencing’ by members through anonymity • Iterative in character with statistical summary at end of each round (Generally 3 rounds) • Consensus (or Divergent Viewpoints) usually emerge at the end of the exercise.

  15. module 8: Production Planning Back to main index exitback to module contents Expert 1 Coordinator Expert 2 Expert n A Statistical summary can be given at end of each round • Mean • Median • Std. deviation 1990 1990 1995 2000 2005 2010 year

  16. module 8: Production Planning Back to main index exitback to module contents DELPHI (Contd.) Round 1 Moving Towards Consensus Round 2 Round 3

  17. module 8: Production Planning Back to main index exitback to module contents Round 1 DELPHI (Contd.) Moving Towards Divergent View Points Round 2 Round 3

  18. module 8: Production Planning Back to main index exitback to module contents MOVING AVERAGES

  19. module 8: Production Planning Back to main index exitback to module contents K PERIOD MA = AVERAGE OF K MOST RECENT OBSERVATIONS For instance : 3 PERIOD MA FOR MAY = Demands of Mar, Apr, May / 3 = (199 + 208 + 121) / 3 = 206.33

  20. module 8: Production Planning Back to main index exitback to module contents CHARACTERISTICS OF MOVING AVERAGES Dt Dt t t (1) MOVING AVERAGES LAG A TREND

  21. module 8: Production Planning Back to main index exitback to module contents Dt t (2) MOVING AVERAGES ARE OUT OF PHASE FOR CYCLIC DEMAND

  22. module 8: Production Planning Back to main index exitback to module contents Dt t (3) MOVING AVERAGES FLATTEN PEAKS

  23. module 8: Production Planning Back to main index exitback to module contents EXPONENTIAL SMOOTHING Ft = one period ahead forecast made at time time t Dt = actual demand for period t  = Smoothing constant (between 0 & 1) (generally chosen values tie between 0.01 and 0.3) Ft = Ft-1 +  (Dt - Ft-1)

  24. module 8: Production Planning Back to main index exitback to module contents Ft =  Dt+(1 - ) Ft-1 =  Dt+(1 - ) [ Dt-1+(1 - )2 Ft-2 ] =…….. =  [Dt+(1 - ) Dt-1+(1 - )2 Dt-2 + ….. + (1 - )t-1 D1 + (1 - )t F0]   (1- )  (1- )2 t-2 t-1 t Weightages given to past data decline exponentially.

  25. module 8: Production Planning Back to main index exitback to module contents MOVING AVERAGES AND EXPONENTIAL SMOOTHING (Equivalence between  & N :)  = 2 / (N+1)

  26. 230  = 0.3 220 3 Month MA Demand  = 0.1 210 200 6 Month MA 190 J F M A M J J A S O N D J Month module 8: Production Planning Back to main index exitback to module contents

  27. module 8: Production Planning Back to main index exitback to module contents Linear dt Common Regression Functions t dt’ forecast dt actual demand (for time period t) dt’ = a + bt (parameters a, b)

  28. module 8: Production Planning Back to main index exitback to module contents Cyclic dt t dt’ = a + u Cos (2/n)t + v Sin (2/n)t (parameters a, u, v)

  29. dt t module 8: Production Planning Back to main index exitback to module contents Cyclic with Growth dt’ = a +bt + u Cos (2/n)t + v Sin (2/n)t (parameters a,b,u, v)

  30. module 8: Production Planning Back to main index exitback to module contents Quadratic dt t dt’ = a +bt + ct2 (parameters a,b,c) Parameters Determined by Minimizing the Sum of Squares of errors,

  31. module 8: Production Planning Back to main index exitback to module contents 246 232 Actual Data 230 218 REGRESSION 220 Ft = 193 + 3t (Regression Line) Demand 210 Forecast for next JAN 200 190 Month (t) J F M A M J J A S O N D J 1 2 3 4 5 6 7 8 9 10 11 12 13

  32. module 8: Production Planning Back to main index exitback to module contents n t = 1 Standard error of estimate =  (Dt - Ft)2 Where Dt = actual demand for period t = 7.32 Ft = forecast for period t n = no. of data points f = degrees of freedom lost (2 in this case) 95 % confidence limits for forecast of next JAN ~ 232  14 (* 2 sigma) n - f

  33. module 8: Production Planning Back to main index exitback to module contents CAUSAL MODELS Here demand is related to Causal variables • GNP • Per Capita income • Consumer Price index • ………… Demand for tyres = f (Production of new automobiles, Replacements by existing autos, Govt policy on automobiles, …..)

  34. module 8: Production Planning Back to main index exitback to module contents Dt =  Pt +  Pt-5 +  could be a simplified causal model (Here parameters  ,,,  are estimated by regression from data) For a Causal Model to be Useful The causal variables should be • Leading • Highly correlated with the variable of interest

  35. module 8: Production Planning Back to main index exitback to module contents TIME SERIES ANALYSIS Time series decomposed into • Trend • Seasonality • Cycle • Randomness And Forecast generated from these components

  36. module 8: Production Planning Back to main index exitback to module contents Stochastic modelling ( Box and Jenkins) Various processes eg. • Autoregressive (AR) order p • Moving average (MA) order q • ARMA order (p,q) • ARIMA order (p,d,q) are used to fit the most appropriate model. These models are accurate (for short term demand forecasting) but highly cumbersome to develop.

  37. module 8: Production Planning Back to main index exitback to module contents Current Data Past Data Forecast Control Forecast Generation Managerial Judgement & Experience Modified Forecast Forecasting System

  38. module 8: Production Planning Back to main index exitback to module contents Moving Range Chart to Control Forecasts MR = | (Ft -Dt) - (Ft-1 - Dt-1) | (Moving Range) MR =  MR / (n – 1) ( There are n-1 moving ranges for n period) Upper Control Limit (UCL) = + 2.66 MR Lower Control Limit ( LML) = - 2.66 MR

  39. module 8: Production Planning Back to main index exitback to module contents 30 30 VARIABLE TO BE PLOTTED = (Ft - Dt) 20 20 10 0 -10 -20 -30 Month (Control Chart for Example)

  40. module 8: Production Planning Back to main index exitback to module contents SUMMARY • Importance of forecasting in planning • Various Methods of forecasting • Subjective methods like opinion polls & Delphi • Moving Averages & Exponential Smoothing • Trend extrapolation by regression • Causal models • Time series decomposition • Forecast Control

  41. module 8: Production Planning Back to main index exitback to module contents 2. The Analysis of Time Series

  42. CORRELATION module 8: Production Planning Back to main index exitback to module contents

  43. module 8: Production Planning Back to main index exitback to module contents CORRELATION vs REGRESSION? • Correlation examines if there is an association between two variables, and if so to what extent. • Regression establishes an appropriate relationship between the variables Y X

  44. module 8: Production Planning Back to main index exitback to module contents SCATTER DIAGRAM r > 0 * r < 0 * * * * * * * * * Positive correlation Negative correlation * * * r = 0 * * * * * * * * * * * * * Non-linear association No correlation

  45. module 8: Production Planning Back to main index exitback to module contents THE CORRELATION COEFFICIENT Pearson’s correlation coefficient, r = (1/n) Sum [(X- X) (Y-Y)] sigma X sigma Y (The numerator is the Co-variance between X and Y)

  46. module 8: Production Planning Back to main index exitback to module contents METHODS OF COMPUTATION • Direct computations using the formula • Cumbersome and lengthy computations • Short-cut or the U-V method • Involves any conveniently assumed mean • Suitable scaling of variables

  47. module 8: Production Planning Back to main index exitback to module contents S. No. X Y x= X-X y= Y-Y x2 y2 xy 1 50 700 21 274 441 75,076 5,754 2 50 650 21 274 441 50,176 4,704 3 50 600 21 174 441 30,276 3,654 4 40 500 11 74 121 5,476 814 5 30 450 1 24 1 576 24 6 20 400 -9 -26 81 676 234 7 20 300 -9 -126 81 15,876 1,134 8 15 250 -14 -176 196 30,976 2,464 9 10 210 -19 -216 361 46,656 4,104 10 5 200 -24 -226 576 51,076 5,424 Total 290 4260 0 0 2,740 3,06,840 28,310 Advertisement expenditure (X) vs Sales (Y) figures for 10 years in Lacs of Rupees.

  48. module 8: Production Planning Back to main index exitback to module contents X = 290/10 = 29 : Y = 4260/10 =426 r = Σxy /[ Σx2Σy2]1/2 = 28310/ (2740 * 306840)1/2 = 0.976 Coefficient of Determination = r2 = 0.953

  49. Y = f(X) module 8: Production Planning Back to main index exitback to module contents WHAT IS REGRESSION? • Discovering how a dependent variable (Y) is related to one or more independent variables (X) Y X

  50. Y = f(X) module 8: Production Planning Back to main index exitback to module contents CRITERION FOR BEST FIT? Mean error Minimize ? Mean absolute error Sum of Squares of Errors Positive error Negative error Least Squares Criterion is the generally preferred criterion