1 / 10
October 7, 2012 TGE
100 likes | 276 Vues
October 7, 2012 TGE. STAND 3cm. STAND 3cm electron thresholds. STAND 3cm gamma ray efficiencies. October 7, 2012 TGE gamma ray simulations. ASNT 01 coincidence gamma ray efficiency. ASNT 01 coincidence on October 7, 2012 TGE. Background energy deposit of Cube lower 20 cm scintillator.
Télécharger la présentation
October 7, 2012 TGE
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
Background energy deposit of Cube lower 20 cm scintillator Threshold ~15 MeV (maximum at 12th code)
Conclusion • If there were high energy gamma rays enough to give a signal in STAND 3cm [1111], ASNT 01 and Cube lower detectors would register much larger increase. Thus, they must be electrons.
More Related