1 / 20

S UPER B SITE ISSUES

S UPER B SITE ISSUES. S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC , Frascati , July 17 th. Outline. The Torvergata Site Preliminary Geological Analysis SPARX project SuperB project SPARX-SuperB synergy Conclusions. The TORVERGATA Site. Torvergata.

avani
Télécharger la présentation

S UPER B SITE ISSUES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUPERBSITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC,Frascati,July 17th

  2. Outline • The Torvergata Site • Preliminary Geological Analysis • SPARX project • SuperB project • SPARX-SuperB synergy • Conclusions

  3. The TORVERGATA Site Torvergata AREA for the SuperB and SPARX Projects

  4. CNR SPARX & SuperB University Campus Roman Villa Sport City

  5. SPARX 1st stage SuperB LINAC SPARX future

  6. S.1 S.3 S.2 S.5 S.4 Soil Brown Pyroclastic Rock Preliminary Sea Level Altitude (m) Gray Pyroclastic Rock Geological analysis • Formed by the Colli Albani volcano more than 600000 years ago • Very Stable volcanic rock

  7. Seismic map • http://zonesismiche.mi.ingv.it/documenti/mappa_opcm3519.pdf • Maximum ground acceleration, with a 10% probability of exceeding it in 50 years.

  8. SELF AMPLIFIED SOURCE RADIATION X PULSED • Composed by: • One LINAC at 1.2 GeV and 2.4 GeV • Three Undulators Lines • Six Experimental Lines SPARX-FEL

  9. Electrical Substation Emergency Exit Room for Air conditioning Room for Cooling plant SPARX-FEL: mid energy LINAC

  10. SPARX-FEL: undulator hall

  11. SPARX-FEL: experimental hall

  12. Ground Level Modulators & Klystrons Tunnel 5 m 500 m 600 m 4 m 5 m LINAC Tunnel SPARX 400 m SuperB: LINAC Tunnel

  13. 20 m 18 m Damping Ring 200 m SuperB: Damping Ring

  14. It will be tunneled by means of a tunneling machine, the same that is now tunneling the C-line subway in Rome 500 m 600 m 5.8 m SuperB: Storage Rings Tunnel

  15. 2 m 0.7 m 0.4 m 0.7 m 0.7 m 4.5 m SuperB: Storage Rings Tunnel Occupancy

  16. 9 electrical substations for SuperB • 2 electrical substations for SparX • about 40 Mw total electrical power needed SuperB: Electrical Substations

  17. - + SuperB: Experimental Hall & Transfer Line

  18. SPARX future

  19. Conclusions • The feasibility study of the SuperB project on the Torvergata site has been done. • A preliminary geological study of the area has given excellent results on the stability of the site. • A strong synergy with the SPARX-FEL project exists, giving the possibility of using the SuperB LINAC as the injector of the fel.

More Related