An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U of M Commissioning:Lessons Learned Jay Denny, PE, CEM

  2. University of Minnesota:Twin Cities Campus • Divided into three geographic areas • Minneapolis – East Bank • Minneapolis – West Bank • St. Paul • ~ 250 buildings • ~ 20 Million GSF • $91 Million Energy Budget

  3. Energy Management • Utilities • Steam • Electricity • Chilled Water • Water • Sewer, Sanitary and Storm • Services • Engineering • University Engineering Record Storage and Retrieval • Energy Efficiency/Conservation

  4. Energy Efficiency Group • Dedicated group within EM • 4 Engineers, 4 EMS, 2 Students • Responsibilities Include: • Demand-Side Management • Remote Metering • Commissioning • New Construction • Existing Buildings

  5. Commissioning: History • Outside Consultants • Little O&M Involvement • Documentation Abundant • Solutions Rare • Problematic Building Startup

  6. Commissioning: Changes • In-House Commissioning Agent • O&M Staff Engaged • Minimized Documentation • Logs, no reports • Focus is on Solutions • CA is advocate and liaison • CA involvement extended • Startup and Warranty

  7. Commissioning: Results • New Construction • MTRF • Jones Hall • Nicholson Hall • Education Sciences (pending) • Control Retrofits • LRB, West Bank, St. Paul

  8. Commissioning: Lessons • Training • Everyone wants it. No one knows what it is • Low retention rate • Testing • Need better financial incentive for deficiency resolution • TAB under commissioning agent? • COR walkthroughs are valuable

  9. Commissioning: Lessons • Design intent • Can (Should) be a moving target • New information is available during construction phase • Focus on what the building should do, not just what it was designed to do • Startup is easier • Problems are fixed faster

  10. Recommissioning: History • Formal Program Started 2004 • Shared cost with local Utility • Issued RFP for 10 studies • Selected 3 firms • Disappointing Results • High relative cost / few viable ECOs • Overlooked opportunities • Long lead time between study and implementation

  11. Recommissioning: Changes • Revised RFP for 2005 • Candidate buildings investigated by EM • Collect Documentation • Preliminary Surveys • Excluded Measures • Improved RFP Scope-of-Work • Approval by Utility • RFP Issued • Spring 2005 • No contract awarded

  12. Recommissioning: Changes • Improved RFP helped, but… • New process devised • Split study into two phases • Phase I: Classic Recommissioning • Phase II: Focused Energy Study • In-house technical and project leadership • Consultants hired as needed (T&M) • Better resource matching • 3 building pilot program • Smith Hall, MCB, Regis Center for the Arts

  13. Recommissioning: Results • Smith Hall study complete. Art and MCB in progress • New process is very flexible • Smith Compressed Air, CHW • More comprehensive • Knowledge remains with customer • ECO Implementation is faster

  14. Recommissioning: Lessons • Resource Constraints • Timing of phases is critical • Phase II investigation should drive TAB • Smaller firms/Higher level resources

  15. Questions ?