1 / 22

Yes No

Do other companies like BMW Group use manufacturing standards to guide performance at their plants?. Yes No. Do you think there is a uniform set of manufacturing standards which companies in similar industries (i.e. automotive industry) use to guide their performance?. Yes No.

azure
Télécharger la présentation

Yes No

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Do other companies like BMW Group use manufacturing standards to guide performance at their plants? • Yes • No

  2. Do you think there is a uniform set of manufacturing standards which companies in similar industries (i.e. automotive industry) use to guide their performance? • Yes • No

  3. Do companies like BMW Group have software or computer programs to help set manufacturing standards for their companies? • Yes • No

  4. Do you think that it is difficult for a company like BMW Group to create manufacturing standards for its plant? • Yes • No

  5. Do companies like BMW Group change their manufacturing standards each year? • Yes • No

  6. Only manufacturing businesses use standards to evaluate and control operations. • True • False

  7. Standards should be revised when they differ from actual costs. • True • False

  8. Standards can be used for direct materials, direct labor and factory overhead. • True • False

  9. An unfavorable cost variance results when actual cost is greater than standard cost at actual volumes. • True • False

  10. A flexible budget may be used to determine the impact of changing production on fixed and variable factory overhead costs. • True • False

  11. A nonfinancial performance measure is a performance measure expressed in dollars. • True • False

  12. The total factory overhead cost variance is the difference between the actual factory overhead and the total overhead applied to production. • True • False

  13. Accounting systems that use standards for manufacturing costs are called • process cost systems • job order cost systems • budget cost systems • standard cost systems

  14. The difference between a standard cost and an actual cost is called a • cost variance • cost inefficiency • control variable • marginal variance

  15. Standards that can be achieved only under perfect operating conditions are called • normal standards • ideal standards • currently attainable standards • variable standards

  16. Standards for direct materials, direct labor and factory overhead can be separated into which two components? • a price standard and a normal standard • a price standard and a variable standard • a price standard and a quantity standard • a normal standard and a quantity standard

  17. A budget performance report will show • actual costs • standard amounts for the actual level of production achieved • the difference between actual costs and standard amounts • all of these choices

  18. The total direct materials cost variance is equal to the • sum of the materials price variance and the materials quantity variance • difference between the materials price variance and the materials quantity variance • product of the materials price variance and the materials quantity variance • materials price variance

  19. The total direct labor cost variance is equal to the • direct labor rate variance • sum of the direct labor rate variance and the direct labor time variance • difference between the direct labor rate variance and the direct labor time variance • product of the direct labor rate variance and the direct labor time variance

  20. In computing factory overhead variances, the standard overhead rate is determined by • dividing the budgeted factory overhead costs by the standard amount of productive activity • dividing the budgeted factory overhead costs by the actual amount of productive activity • dividing the actual factory overhead costs by the standard amount of productive activity • dividing the actual factory overhead costs by the actual amount of productive activity

  21. The variable factory overhead controllable variance is • the difference between the standard variable overhead incurred at actual production and the budgeted variable overhead for actual production • the sum of the actual variable overhead incurred and the budgeted variable overhead for actual production • the difference between the actual variable overhead incurred and the budgeted variable overhead for actual production • the difference between the actual variable overhead incurred and the standard variable overhead for actual production

  22. If the standard fixed overhead exceeds the budgeted overhead at 100% of normal capacity, the variance is • not able to be determined • neither favorable nor unfavorable • unfavorable • favorable

More Related