1 / 111

Weekend Cabin Retreat Project Wall and Ceiling Construction

Weekend Cabin Retreat Project Wall and Ceiling Construction. Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E. Objectives. Name the members of a typical frame wall. Explain methods of frame wall construction. Interpret information shown on a ceiling joist span data chart.

bakerhelen
Télécharger la présentation

Weekend Cabin Retreat Project Wall and Ceiling Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Weekend Cabin Retreat ProjectWall and Ceiling Construction Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E. EDT 300 - Wall and Ceiling Construction

  2. Objectives • Name the members of a typical frame wall. • Explain methods of frame wall construction. • Interpret information shown on a ceiling joist span data chart. • Sketch the various types of exterior walls used in residential construction. EDT 300 - Wall and Ceiling Construction

  3. Residential Construction • Residential wall construction is usually one of three types: • Frame • Masonry • Combination frame and masonry. EDT 300 - Wall and Ceiling Construction

  4. Residential Construction • The wall panels may be • Constructed on site or • Prefabricated at another location and transported to the site. • The trend is toward more prefabrication and less on-site construction. EDT 300 - Wall and Ceiling Construction

  5. Frame Wall Construction • Various framing members used in conventional construction. • Sole plate • Bottom of wall. 2 x 4 on side. • Top plates • Top of wall. 2 x 4 on side. • Studs • Sides of wall. 2 x 4 on end. • Headers • Span openings in walls. 4 x 10; 4 x 12. Etc. • Bracing. • Strengthens wall corners. EDT 300 - Wall and Ceiling Construction

  6. EDT 300 - Wall and Ceiling Construction

  7. Frame Wall Construction EDT 300 - Wall and Ceiling Construction

  8. Frame Wall Construction • Plates and studs • 2 x 4 inch lumber. • Headers or linters • 4 x 6; 4 x 8; 4 x 10; 4 x 12 • Bracing • 1 x 4 stock • Metal strap • Plywood sheathing. EDT 300 - Wall and Ceiling Construction

  9. Frame Wall Construction EDT 300 - Wall and Ceiling Construction

  10. Frame Wall Construction • Wall framing lumber must have • Good stiffness • Nail-holding properties • Free from warp • Easy to work. • Species that meet these criteria: • Douglas fir • Southern Yellow Pine • Hemlock • Spruce, and Larch. EDT 300 - Wall and Ceiling Construction

  11. Frame Wall Construction • The most common lumber grade used is #2 grade or its equivalent. • Moisture content should be between 15 and 19 percent. EDT 300 - Wall and Ceiling Construction

  12. Frame Wall Construction • Frame Wall Construction • Usually begins with the sole plate. • The spacing of the studs is marked off on the sole plate • The wall is built on top of the sub-floor. • The sub-floor provides a large, flat work surface. EDT 300 - Wall and Ceiling Construction

  13. Frame Wall Construction EDT 300 - Wall and Ceiling Construction

  14. Frame Wall Construction • Exterior frame walls can be • Flush with the outside of the foundation wall or • Moved 1/2" to 3/4" inside the foundation wall to allow for the thickness of sheathing, weatherboard, or rigid foam insulation. EDT 300 - Wall and Ceiling Construction

  15. Frame Wall Construction EDT 300 - Wall and Ceiling Construction

  16. Frame Wall Construction EDT 300 - Wall and Ceiling Construction

  17. Frame Wall Construction EDT 300 - Wall and Ceiling Construction

  18. Frame Wall Construction • The sole plate • Acts as an anchor for the wall panels • Is a nailer for interior and exterior wall sheathing. • A nailer • Is a structural member (like a 2 x 4) that is used to support the drywall (gypsum board). EDT 300 - Wall and Ceiling Construction

  19. Frame Wall Construction • A wall panel, when built on-site • May be very large if sufficient people and equipment are available to raise the wall. • Is usually built in smaller sections. EDT 300 - Wall and Ceiling Construction

  20. Frame Wall Construction • Wall studs • Are cut to length (usually 7'-9" when 1-1/2" material is used) • Are nailed to the sole and top plate. • A second plate is added after the wall is in place. EDT 300 - Wall and Ceiling Construction

  21. Frame Wall Construction • The distance from the top of the subfloor to the bottom of the ceiling joists is usually 8'-1 1/2". • This distance provides a finished wall height of 8'-O". EDT 300 - Wall and Ceiling Construction

  22. Frame Wall Construction • Openings for doors and windows are framed before the wall is moved to the vertical position. • The door and window opening must be framed with headers, to span the opening. EDT 300 - Wall and Ceiling Construction

  23. Frame Wall Construction • Two methods are used in constructing headers • Solid blocking. • Cripple construction. EDT 300 - Wall and Ceiling Construction

  24. Frame Wall Construction • Solid blocking header • The header size is increased. • The header completely fills the space from the top of the rough opening to the top plate. EDT 300 - Wall and Ceiling Construction

  25. Frame Wall Construction • Solid blocking header construction • Various methods are used • 1. Two 2 x 12 pieces of lumber are nailed together with a piece of 1/2" plywood between them to form a 3 1/2" thick header. • This method reduces construction time, but increases shrinkage. • 2. Solid 4 x 6, 4 x 8, 4 x 10 wood members may also be used. • Trend is to use solid members. • Faster, saves construction labor costs. EDT 300 - Wall and Ceiling Construction

  26. EDT 300 - Wall and Ceiling Construction

  27. EDT 300 - Wall and Ceiling Construction

  28. Frame Wall Construction • Header Construction - Cripple and Trimmer • Older method. • Uses cripple studs and trimmers firmly nailed to the sole and top plates. • Cripples are studs that are not full length due to a wall opening. • Trimmers are studs that support the header over an opening in the wall. EDT 300 - Wall and Ceiling Construction

  29. EDT 300 - Wall and Ceiling Construction

  30. EDT 300 - Wall and Ceiling Construction

  31. EDT 300 - Wall and Ceiling Construction

  32. EDT 300 - Wall and Ceiling Construction

  33. Frame Wall Construction • Corner bracing is required by most codes. • Two methods of bracing are used. • Diagonal corner braces • Plywood sheathing EDT 300 - Wall and Ceiling Construction

  34. Frame Wall Construction • Diagonal corner braces • Use 1 x 4 inch wood material or • Metal straps • Installed from the top corner of the wall down to the sole plate. EDT 300 - Wall and Ceiling Construction

  35. EDT 300 - Wall and Ceiling Construction

  36. Frame Wall Construction • Plywood Sheathing Bracing • A sheet of 1/2" plywood • Nailed to the studs at each corner EDT 300 - Wall and Ceiling Construction

  37. EDT 300 - Wall and Ceiling Construction

  38. Frame Wall Construction • Typical methods of framing used to form exterior wall corners EDT 300 - Wall and Ceiling Construction

  39. EDT 300 - Wall and Ceiling Construction

  40. EDT 300 - Wall and Ceiling Construction

  41. EDT 300 - Wall and Ceiling Construction

  42. Frame Wall Construction • The corner must provide • A nailing edge for the interior wall material • Drywall (gypsum board). • Adequate support for the structure. EDT 300 - Wall and Ceiling Construction

  43. Frame Wall Construction • Interior frame walls are constructed the same way as exterior walls. • Sole plates. • Bottom of wall • One 2 x 4 member on side. • Studs • 2 x 4 wall members • Double top plates. • Top of wall • Two 2 x 4 members on side. EDT 300 - Wall and Ceiling Construction

  44. Frame Wall Construction • Interior walls • Must be securely fastened to the exterior walls that they intersect. • A nailing edge must be provided for the plaster base, drywall, or paneling. • Use a 2 x 6 secured to cross blocking. • Double the exterior wall studs at the intersection of the partition. • The same arrangement is used at the intersection of all interior walls. EDT 300 - Wall and Ceiling Construction

  45. ExteriorWalls EDT 300 - Wall and Ceiling Construction

  46. InteriorWalls EDT 300 - Wall and Ceiling Construction

  47. Frame Wall Construction • Rough openings for windows and doors • Are dimensioned to the center of the opening when located in a frame wall. • Specific dimensions of doors and windows are usually provided by the window and door schedule. • The width is listed first and • The height is listed second. EDT 300 - Wall and Ceiling Construction

  48. Frame Wall Construction • The rough opening height of most doors is 6'-10". • Tops of all windows are usually the same distance above the floor as doors. EDT 300 - Wall and Ceiling Construction

  49. Frame Wall Construction • Each wall opening requires a headerabove the opening. • The header supports the weight above. • The length of the header will be equal to • The width of the rough opening + • The thickness of two trimmers. EDT 300 - Wall and Ceiling Construction

  50. EDT 300 - Wall and Ceiling Construction

More Related