1 / 8

Stato CSA07 (e Physics Analysis notes)

Stato CSA07 (e Physics Analysis notes). Le attivita’ di “CSA07” e “Physics Analysis Notes” sono inizialmente distinte Le Physics Analysis note (deadline primo DRAF il 18 Ottobre) saranno basate inizialmente sui dati “Spring07” (RECO con CMSSW_1_3_1)

Télécharger la présentation

Stato CSA07 (e Physics Analysis notes)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stato CSA07 (e Physics Analysis notes) Le attivita’ di “CSA07” e “Physics Analysis Notes” sono inizialmente distinte Le Physics Analysis note (deadline primo DRAF il 18 Ottobre) saranno basate inizialmente sui dati “Spring07” (RECO con CMSSW_1_3_1) vi sara’ quindi un upgrade con i dati “Summer07” (RECO con CMSSW_1_5_2) l’utilizzo dei dati prodotti con la CSA07 e’ ancora da valutare. La CSA07 utilizzera’ dataset GEN-SIM di tipo CMSSW_1_4_X (X>3) I RECO e le informazioni HLT verrano ricostruiti con CMSSW_1_6_3 L’inizio della ricostruzione (pre-CSA07) e’ previsto per Lunedi 1 Ottobre • Production release CMSSW_1_6_3 is available • Forum:Software Release AnnouncementsDate: Sep 27, 14:15

  2. La CSA07 prevede il processamento di due gruppi di dataset • CSA07 Cocktail ~ 100 M di eventi di “fondi” • Min bias (20 Mevt) QCD jets (25 Mevt) • photon+jets (5 Mevt) Drell-Yan and Onia (10 Mevt) • Electrons/muons enrich. (mostly from b-decays) (20 Mevt) • W/Z (plus jets) (20 Mevt) Top (1 Mevt) • 2) CSA07 Signal ~ 100 M di eventi di segnali e “fondi” • H->ZZ, H->WW, qqH, VVH , H->2g , SUSY, Z’, altri EWK • Ogni gruppo verrà suddiviso in 7 Primary Dataset (raggruppamenti di stream HLT): • Electron, Muon, Tau, bJet, JetMET, Photon, JetMETCa News 27-9-2007 Due to limitations in our ability to combine Pythia and Alpgen data and Pythia and Filtered Pythia data we will make three soups. These three soups will be Alpgen, Pythia, and Unfiltered Pythia. We will start with the Alpgen soup.

  3. Schema di produzione dei Primary Dataset CMSSW_1_6_3 CMSSW_1_6_3

  4. CAF – Central Analysis Facility Full access to the CMS CAF for the following individuals: Higgs: ezio.torassa@pd.infn.itJavier.Fernandez.Menendez@cern.chSusy: Matthias.U.Mozer@cern.chBruce.Kennedy@cern.chEW: tucker@physics.ucla.eduluca.lista@cern.ch Coordinator – Luca Lista E’ previsto un set di programmi di skim che eseguiranno una rapida pre-analisi dei dati al Tier-0

  5. Stato delle “Physics Analysis Notes” Search for the Production of SM-like Higgs Bosons in the H → WW(*) → 2l± 2ν Decay Channels Editor - Yves Sirois 1 : trigger - Ezio Torassa 2 (and 8) :eID - Emanuele Di Marco (and/or Roberto Salerno) 2' (and 8) :muID - Evelyne Delmeire 3 and 4 : jets, MET - Joanna Weng 5 (6,7) 9: Common pre-selection cuts and M-dependent cut based analysis (combining): Fabian Stockli with ee control plots: C. Rovelli or P. Govoni mumu control plots: J. Cuevas-Maesto 10: MVA analysis (combining all): Guillelmo Gomez-Ceballos H->WW->2l Meeting (2007 Note) Friday 28 September 2007 starting at 14:00 Dead line primo draft (con figure e numeri): 18 Ottobre Primo draft con paragrafi e testo a breve

  6. Measurement of the inclusive W -> μn and Z -> μ+μ− cross sections in pp collisions at √s = 14GeV Editor - Juan Alcaraz Event selection • Proposed cuts for Z -> μ+μ− (+ De Filipis, De Gruttola, Fabozzi, . . . ) • Proposed cuts forW -> μn (+ Torassa, Lacaprara, Josa (MET studies?), . . . ) Margoni Backgrounds • Ways to estimate them on data (at least for inclusive muons): fake rates and interplay with isolation cuts (+ Delmeire, Torassa, Margoni) EW Muon Meeting (2007 Note), VRVS Sunny Tuesday 02 October 2007 starting at 15:00 Dead line primo draft (con figure e numeri): 18 Ottobre Primo draft con paragrafi e testo disponibile

  7. Novita’ dai Tier-2 Italiani • Approvato Tier-2 Pisa !!! CD del 27 Settembre • Organizzazione Tier-2 completata, sono in funzione le procedure di: • - commissioning link (gestite dai Site Administrators) • autorizzazione dei tasferimenti (gestite dai Data Managers) • (Nicola passa sotto contratto con Paris VI , lascia le attuali responsabilita’ ) Tier-2 CSA07 Check List Links between CMS Tiers

  8. Risorse dei Tier-2 Italiani Bari Cpu 20.0 (kSI2k) Job Slots 24.0 (#) Disk Store 15.0 (TB) Legnaro Cpu 160.0 (kSI2k) Job Slots 130.0 (#) Disk Store 35.0 (TB) Pisa Cpu 500.0 (kSI2k) Job Slots 300.0 (#) Disk Store 15.0 (TB) Roma Cpu 150.0 (kSI2k) Job Slots 100.0 (#) Disk Store 24.0 (TB) entro 2007 + 165 kSI2k + 15 TB richieste 2008 + 400 kSI2k + 120 TB

More Related