An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HOLDEN HEIGHTS PHASE IV FY 2008-09 Budget Worksession July 21, 2008

  2. PRESENTATION OUTLINE • Background • Project Description • Funding • Summary

  3. PRESENTATION OUTLINE • Background • Project Description • Funding • Summary

  4. BACKGROUND Holden Heights Community

  5. BACKGROUND

  6. BACKGROUND • Lake June and Clear Lake Contamination • Historical Water Quality Violations (1970’s and 1980’s) • 1995 Water Quality Study • Failing Septic Tanks • Untreated Stormwater Runoff

  7. BACKGROUND • Eliminate Septic Systems • Central Sanitary Sewer • Install Closed Stormwater System • Improve Existing Roadways • Sidewalk Improvements

  8. BACKGROUND • Phase 1 • $5.8M • Completed 2003

  9. BACKGROUND • Phase 2 • $11.2M • Completed 2006

  10. BACKGROUND • Phase 3 • $14.6M • Under Construction

  11. BACKGROUND • Funding Partners – Phases 1, 2, and 3 • Orange County • Orlando Utilities Commission • Environmental Protection Agency (EPA) • South Florida Water Management District • Housing and Urban Development (HUD)

  12. BACKGROUND • Phase 4 • Preliminary Engineering Report Complete

  13. PRESENTATION OUTLINE • Background • Project Description • Funding • Summary

  14. PROJECT DESCRIPTION • Sanitary Sewer • Stormwater Improvements • Roadways/Sidewalks • Potable Water • Lake June Sidewalk Amenities

  15. PRESENTATION OUTLINE • Background • Project Description • Funding • Summary

  16. FUNDING • Estimated Construction Cost - $5.3M • Orange County Utilities: $2.2M (funded) • OUC: $700K (funded) • Public Works: $2.4M (unfunded)

  17. FUNDING • Proposal: • Utilize CDBG funding for Public Works infrastructure • $500K Design (FY 2008-09) • $2.4M Construction (future) • Utilize Orange County/OBT CRA Funding for Lake June Sidewalk Amenities • $150K (FY 2008-09)

  18. PRESENTATION OUTLINE • Background • Project Description • Funding • Summary

  19. SUMMARY • Three Phases Completed • CRA Redevelopment Plan Consistency • Leverage Available Funding Resources • Final Phase of Holden Heights Infrastructure

  20. HOLDEN HEIGHTS PHASE IV FY 2008-09 Budget Worksession July 21, 2008